IAC logo
IAC Assessment: LT0044
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LT0044
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana Tech
Assessment Year 1985
Principal Product POLYETHYLENE FILM PRODUCTS
NAICS n/a
SIC 3083 - Laminated Plastics Plate & Sheet
Sales $10,000,000-$50,000,000
# of Employees 112
Plant Area (Sq.Ft.) 0
Annual Production 45,000,000 Pounds
Production Hrs. Annual 8,686
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $629,652 13,282,826 kWh $0.05
Natural Gas $40,620 8,646 MMBtu $4.70
TOTAL ENERGY COSTS $670,272
RECOMMENDED SAVINGS* $27,011 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,788
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,544
Cost:
-
$1,544 37,515 - - $1,544
37,515
kWh
-
-
MMBtu
02: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$3,879
Cost:
$8,181
$3,879 100,821 - - $3,879
100,821
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,161
Cost:
$680
$3,161 74,736 - - $3,161
74,736
kWh
-
-
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,403
Cost:
$139
$1,403 33,411 - - $1,403
33,411
kWh
-
-
MMBtu
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,121
Cost:
$450
$725 18,757 $396 84 $725
18,757
kWh
$396
84
MMBtu
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,627
Cost:
$60
- - $2,627 559 -
-
kWh
$2,627
559
MMBtu
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,430
Cost:
$1,840
$5,430 140,973 - - $5,430
140,973
kWh
-
-
MMBtu
08: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$7,330
Cost:
$750
$7,330 190,211 - - $7,330
190,211
kWh
-
-
MMBtu
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$516
Cost:
$100
$516 13,482 - - $516
13,482
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$27,011
Cost:
$12,200
$23,988 609,906 $3,023 643 $23,988
609,906
kWh
$3,023
643
MMBtu
TOTAL IMPLEMENTED Savings:
$10,788
Cost:
$9,371
$7,765 194,314 $3,023 643 $7,765
194,314
kWh
$3,023
643
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas