IAC logo
IAC Assessment: LT0062
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LT0062
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana Tech
Assessment Year 1986
Principal Product CAST ALUMINUM LOGS
NAICS n/a
SIC 3363 - Aluminum Die-castings
Sales $10,000,000-$50,000,000
# of Employees 30
Plant Area (Sq.Ft.) 0
Annual Production 48,600,000 Pounds
Production Hrs. Annual 8,518
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $117,690 2,278,136 kWh $0.05
Natural Gas $837,389 211,810 MMBtu $3.95
TOTAL ENERGY COSTS $955,079
RECOMMENDED SAVINGS* $181,409 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $70,506
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$60,455
Cost:
$5,000
- - $60,935 15,427 $(-480) - -
-
kWh
$60,935
15,427
MMBtu
$(-480)
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$7,530
Cost:
$500
- - $8,010 2,027 $(-480) - -
-
kWh
$8,010
2,027
MMBtu
$(-480)
-
$
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$2,521
Cost:
-
- - $2,521 638 - - -
-
kWh
$2,521
638
MMBtu
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$79,027
Cost:
$80,080
$(-3,650) (-70,633) $82,677 20,931 - - $(-3,650)
(-70,633)
kWh
$82,677
20,931
MMBtu
-
-
$
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$20,440
Cost:
$22,200
$(-3,660) (-70,340) $24,100 6,100 - - $(-3,660)
(-70,340)
kWh
$24,100
6,100
MMBtu
-
-
$
06: 2.1122 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT Savings:
$11,242
Cost:
-
- - $11,242 2,846 - - -
-
kWh
$11,242
2,846
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$194
Cost:
$187
$194 3,810 - - - - $194
3,810
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$181,409
Cost:
$107,967
$(-7,116) (-137,163) $189,485 47,969 $(-960) - $(-7,116)
(-137,163)
kWh
$189,485
47,969
MMBtu
$(-960)
-
$
TOTAL IMPLEMENTED Savings:
$70,506
Cost:
$5,500
- - $71,466 18,092 $(-960) - -
-
kWh
$71,466
18,092
MMBtu
$(-960)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes