IAC logo
IAC Assessment: LT8367
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LT8367
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana Tech
Assessment Year 2023
Principal Product Treated Wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $5,000,000-$10,000,000
# of Employees 6
Plant Area (Sq.Ft.) 380,000
Annual Production 1,123,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $221,100 3,654,560 kWh $0.06
Electricity Demand $15,227 6,091 kW-months/year $2.50
Electricity Fees $87 - $ -
TOTAL ENERGY COSTS $236,414
RECOMMENDED SAVINGS* $64,337 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,344
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Usage Electricity Usage Electricity Demand Water Usage
$ kWh $ kW-months/year $ Tgal
01: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$53,474
Cost:
$5,948
$1,186 (-19,597) - - $52,288 37,890 $1,186
(-19,597)
kWh
-
-
kW-months/year
$52,288
37,890
Tgal
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$2,629
Cost:
$335,972
$2,460 40,657 $169 68 - - $2,460
40,657
kWh
$169
68
kW-months/year
-
-
Tgal
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$7,506
Cost:
$3,722
$7,023 116,076 $484 193 - - $7,023
116,076
kWh
$484
193
kW-months/year
-
-
Tgal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$209
Cost:
$343
$209 3,446 - - - - $209
3,446
kWh
-
-
kW-months/year
-
-
Tgal
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$519
Cost:
$332
$519 8,580 - - - - $519
8,580
kWh
-
-
kW-months/year
-
-
Tgal
TOTAL RECOMMENDED Savings:
$64,337
Cost:
$346,317
$11,396 149,163 $653 261 $52,288 37,890 $11,396
149,163
kWh
$653
261
kW-months/year
$52,288
37,890
Tgal
TOTAL IMPLEMENTED Savings:
$10,344
Cost:
$340,037
$9,691 160,179 $653 261 - - $9,691
160,179
kWh
$653
261
kW-months/year
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal
Electricity Usage Electricity Demand Water Usage Electricity Usage Electricity Demand Water Usage