IAC logo
IAC Assessment: LT8382
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LT8382
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana Tech
Assessment Year 2024
Principal Product Frozen prepared fish
NAICS 311710 - Seafood Product Preparation and Packaging
SIC 2092 - Fresh Or Frozen Prepared Fish
Sales $5,000,000-$10,000,000
# of Employees 25
Plant Area (Sq.Ft.) 54,043
Annual Production 5,500,000 Pounds
Production Hrs. Annual 2,340
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $245,063 2,445,500 kWh $0.10
Electricity Fees $23,799 - $ -
Natural Gas $13,017 872 MMBtu $14.93
TOTAL ENERGY COSTS $281,879
RECOMMENDED SAVINGS* $39,763 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$14,178
Cost:
$61,016
$14,178 141,500 $14,178
141,500
kWh
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,368
Cost:
$8,172
$3,368 33,613 $3,368
33,613
kWh
03: 2.7134 USE PHOTOCELL CONTROLS Savings:
$731
Cost:
$328
$731 7,300 $731
7,300
kWh
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$8,755
Cost:
$8,100
$8,755 87,377 $8,755
87,377
kWh
05: 2.2533 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS Savings:
$2,042
Cost:
$4,483
$2,042 20,381 $2,042
20,381
kWh
06: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$2,120
Cost:
$600
$2,120 21,163 $2,120
21,163
kWh
07: 2.3112 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS Savings:
$8,567
Cost:
$56,250
$8,567 85,500 $8,567
85,500
kWh
TOTAL RECOMMENDED Savings:
$39,763
Cost:
$138,949
$39,763 396,834 $39,763
396,834
kWh
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - -
-
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage