IAC logo
IAC Assessment: LT8384
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LT8384
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana Tech
Assessment Year 2023
Principal Product Lumber
NAICS 321999 - All Other Miscellaneous Wood Product Manufacturing
SIC 2421 - Sawmills And Planing Mills, General
Sales $100,000,000-$500,000,000
# of Employees 180
Plant Area (Sq.Ft.) 4,660,488
Annual Production 240,000,000 Units
Production Hrs. Annual 5,640
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,637,836 28,840,000 kWh $0.09
Electricity Demand $17,215 60,467 kW-months/year $0.28
TOTAL ENERGY COSTS $2,662,728
RECOMMENDED SAVINGS* $135,540 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Ancillary Material Cost Electricity Usage Ancillary Material Cost
$ kWh $ $
01: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$52,627
Cost:
$4,413
- - $52,627 - -
-
kWh
$52,627
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,410
Cost:
$35,947
$8,410 92,011 - - $8,410
92,011
kWh
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$68,891
Cost:
$30
$68,891 757,047 - - $68,891
757,047
kWh
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,612
Cost:
$350
$5,612 61,404 - - $5,612
61,404
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$135,540
Cost:
$40,740
$82,913 910,462 $52,627 - $82,913
910,462
kWh
$52,627
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Ancillary Material Cost Electricity Usage Ancillary Material Cost