Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1984 |
Principal Product | FLUID MILK PRODUCTS |
NAICS | n/a |
SIC | 2024 - Ice Cream And Frozen Desserts |
Sales | $10,000,000-$50,000,000 |
# of Employees | 155 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 20,300 Thousand Gallons |
Production Hrs. Annual | 5,928 |
Location (State) | VT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $251,984 | 4,682,884 | kWh | $0.05 |
Fuel Oil #2 | $8,240 | 980 | MMBtu | $8.41 |
Fuel Oil #4 | $84,341 | 14,256 | MMBtu | $5.92 |
TOTAL ENERGY COSTS | $344,565 | |||
RECOMMENDED SAVINGS* | $36,861 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $20,258 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #2 | Fuel Oil #4 | Electricity Usage | Fuel Oil #2 | Fuel Oil #4 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $712 Cost: $135 |
$712 | 13,189 | - | - | - | - |
$712 13,189 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $574 Cost: $200 |
$574 | 10,551 | - | - | - | - |
$574 10,551 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $4,782 Cost: $1,260 |
$4,782 | 88,511 | - | - | - | - |
$4,782 88,511 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $8,400 Cost: $6,300 |
$8,400 | 156,213 | - | - | - | - |
$8,400 156,213 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING |
Savings: $3,110 Cost: $4,000 |
- | - | - | - | $3,110 | 526 |
- - kWh |
- - MMBtu |
$3,110 526 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2447 HEAT WATER WITH EXHAUST HEAT |
Savings: $16,603 Cost: $22,000 |
- | - | - | - | $16,603 | 2,796 |
- - kWh |
- - MMBtu |
$16,603 2,796 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7291 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS |
Savings: $2,680 Cost: $8,130 |
- | - | $8,245 | 1,003 | $(-5,565) | (-940) |
- - kWh |
$8,245 1,003 MMBtu |
$(-5,565) (-940) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $36,861 Cost: $42,025 |
$14,468 | 268,464 | $8,245 | 1,003 | $14,148 | 2,382 | $14,468 268,464 kWh |
$8,245 1,003 MMBtu |
$14,148 2,382 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $20,258 Cost: $20,025 |
$14,468 | 268,464 | $8,245 | 1,003 | $(-2,455) | (-414) | $14,468 268,464 kWh |
$8,245 1,003 MMBtu |
$(-2,455) (-414) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #2 | Fuel Oil #4 | Electricity Usage | Fuel Oil #2 | Fuel Oil #4 |