Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1984 |
Principal Product | INDUSTRIAL PLASTIC |
NAICS | n/a |
SIC | 2821 - Plastics Materials And Resins |
Sales | $1,000,000-$5,000,000 |
# of Employees | 70 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 380,000 Pounds |
Production Hrs. Annual | 6,528 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $105,658 | 1,403,869 | kWh | $0.08 |
LPG | $75 | 6 | MMBtu | $12.50 |
Fuel Oil #4 | $20,358 | 3,449 | MMBtu | $5.90 |
TOTAL ENERGY COSTS | $126,091 | |||
RECOMMENDED SAVINGS* | $6,906 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $6,906 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #4 | Electricity Usage | Fuel Oil #4 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,481 Cost: $426 |
$1,738 | 23,154 | $(-257) | (-44) |
$1,738 23,154 kWh |
$(-257) (-44) MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,985 Cost: $548 |
$3,985 | 53,048 | - | - |
$3,985 53,048 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $303 Cost: $200 |
- | - | $303 | 51 |
- - kWh |
$303 51 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $1,051 Cost: $1,400 |
- | - | $1,051 | 178 |
- - kWh |
$1,051 178 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $86 Cost: $185 |
$86 | 1,172 | - | - |
$86 1,172 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $6,906 Cost: $2,759 |
$5,809 | 77,374 | $1,097 | 185 | $5,809 77,374 kWh |
$1,097 185 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $6,906 Cost: $2,759 |
$5,809 | 77,374 | $1,097 | 185 | $5,809 77,374 kWh |
$1,097 185 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #4 | Electricity Usage | Fuel Oil #4 |