Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1985 |
Principal Product | THERMOSET PLASTICS |
NAICS | n/a |
SIC | 3083 - Laminated Plastics Plate & Sheet |
Sales | $1,000,000-$5,000,000 |
# of Employees | 45 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 5,250,000 Pounds |
Production Hrs. Annual | 5,880 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $46,690 | 579,132 | kWh | $0.08 |
Natural Gas | $5,318 | 758 | MMBtu | $7.02 |
Wood | $638 | 731 | MMBtu | $0.87 |
TOTAL ENERGY COSTS | $52,646 | |||
RECOMMENDED SAVINGS* | $10,628 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $4,286 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6124 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE |
Savings: $454 Cost: - |
- | - | $659 | 94 | $(-205) | - |
- - kWh |
$659 94 MMBtu |
$(-205) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.6123 BURN WOOD BY-PRODUCTS FOR HEAT |
Savings: $2,010 Cost: $8,450 |
- | - | $2,215 | 316 | $(-205) | - |
- - kWh |
$2,215 316 MMBtu |
$(-205) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,822 Cost: $105 |
$1,822 | 22,567 | - | - | - | - |
$1,822 22,567 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7229 AIR CONDITION ONLY SPACE NECESSARY |
Savings: $435 Cost: $100 |
- | - | $435 | 62 | - | - |
- - kWh |
$435 62 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $2,005 Cost: $3,702 |
- | - | $2,005 | 286 | - | - |
- - kWh |
$2,005 286 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,902 Cost: $4,380 |
$3,902 | 48,359 | - | - | - | - |
$3,902 48,359 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $10,628 Cost: $16,737 |
$5,724 | 70,926 | $5,314 | 758 | $(-410) | - | $5,724 70,926 kWh |
$5,314 758 MMBtu |
$(-410) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $4,286 Cost: $8,555 |
$1,822 | 22,567 | $2,874 | 410 | $(-410) | - | $1,822 22,567 kWh |
$2,874 410 MMBtu |
$(-410) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes |