IAC logo
IAC Assessment: MA0022
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0022
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1985
Principal Product ICE CREAM,KEFIR,EGGNOG
NAICS n/a
SIC 2023 - Dry, Condensed, Evaporated Products
Sales $1,000,000-$5,000,000
# of Employees 7
Plant Area (Sq.Ft.) 0
Annual Production 140 Thousand Gallons
Production Hrs. Annual 0
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $26,032 341,735 kWh $0.08
Fuel Oil #2 $4,443 601 MMBtu $7.39
TOTAL ENERGY COSTS $30,475
RECOMMENDED SAVINGS* $4,851 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,628
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2
$ kWh $ MMBtu
01: 2.2447 HEAT WATER WITH EXHAUST HEAT Savings:
$2,163
Cost:
$1,875
$2,163 28,429 - - $2,163
28,429
kWh
-
-
MMBtu
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$753
Cost:
$1,827
$1,293 16,999 $(-540) (-73) $1,293
16,999
kWh
$(-540)
(-73)
MMBtu
03: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$160
Cost:
$154
- - $160 22 -
-
kWh
$160
22
MMBtu
04: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$283
Cost:
-
- - $283 38 -
-
kWh
$283
38
MMBtu
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$432
Cost:
$289
$432 - - - $432
-
kWh
-
-
MMBtu
06: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$1,060
Cost:
$1,190
$1,060 - - - $1,060
-
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$4,851
Cost:
$5,335
$4,948 45,428 $(-97) (-13) $4,948
45,428
kWh
$(-97)
(-13)
MMBtu
TOTAL IMPLEMENTED Savings:
$1,628
Cost:
$2,270
$1,725 16,999 $(-97) (-13) $1,725
16,999
kWh
$(-97)
(-13)
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2