IAC Assessment: MA0031
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0031
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1985
Principal Product ALUMINUM TOOLS
NAICS n/a
SIC 3363 - Aluminum Die-castings
Sales $1,000,000-$5,000,000
# of Employees 19
Plant Area (Sq.Ft.) 0
Annual Production 30,000 Pounds
Production Hrs. Annual 2,600
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $25,103 291,032 kWh $0.09
Natural Gas $4,972 700 MMBtu $7.10
TOTAL ENERGY COSTS $30,075
RECOMMENDED SAVINGS* $4,428 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $646
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$376
Cost:
$45
$376 4,396 - - - - $376
4,396
kWh
-
-
MMBtu
-
-
$
02: 2.6232 INSTALL SET-BACK TIMERS Savings:
$376
Cost:
$186
$376 4,396 - - - - $376
4,396
kWh
-
-
MMBtu
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$91
Cost:
$100
$91 1,172 - - - - $91
1,172
kWh
-
-
MMBtu
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$209
Cost:
$540
$313 3,517 $(-104) (-15) - - $313
3,517
kWh
$(-104)
(-15)
MMBtu
-
-
$
05: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$3,197
Cost:
-
$(-188) (-2,345) $3,272 461 $113 - $(-188)
(-2,345)
kWh
$3,272
461
MMBtu
$113
-
$
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$179
Cost:
$405
- - $179 25 - - -
-
kWh
$179
25
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$4,428
Cost:
$1,276
$968 11,136 $3,347 471 $113 - $968
11,136
kWh
$3,347
471
MMBtu
$113
-
$
TOTAL IMPLEMENTED Savings:
$646
Cost:
$550
$467 5,568 $179 25 - - $467
5,568
kWh
$179
25
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes