IAC logo
IAC Assessment: MA0035
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0035
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1985
Principal Product MULTI-PLY PAPER PRODUCTS
NAICS n/a
SIC 2679 - Converted Paper Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 52
Plant Area (Sq.Ft.) 0
Annual Production 340,000 Thousand Feet
Production Hrs. Annual 2,125
Location (State) RI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $85,031 849,941 kWh $0.10
Natural Gas $2,553 283 MMBtu $9.02
Fuel Oil #2 $4,829 584 MMBtu $8.27
Fuel Oil #4 $162,786 27,504 MMBtu $5.92
Fuel Oil #6 $83,874 15,352 MMBtu $5.46
TOTAL ENERGY COSTS $339,073
RECOMMENDED SAVINGS* $51,374 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,657
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #6 Administrative Changes Electricity Usage Fuel Oil #6 Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$35,472
Cost:
$33,300
- - $38,472 7,060 $(-3,000) - -
-
kWh
$38,472
7,060
MMBtu
$(-3,000)
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,444
Cost:
$795
- - $1,444 265 - - -
-
kWh
$1,444
265
MMBtu
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$235
Cost:
$100
$235 2,345 - - - - $235
2,345
kWh
-
-
MMBtu
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$8,213
Cost:
$1,287
- - $8,213 1,507 - - -
-
kWh
$8,213
1,507
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$498
Cost:
$913
$498 4,982 - - - - $498
4,982
kWh
-
-
MMBtu
-
-
$
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$5,512
Cost:
$9,450
$5,512 55,100 - - - - $5,512
55,100
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$51,374
Cost:
$45,845
$6,245 62,427 $48,129 8,832 $(-3,000) - $6,245
62,427
kWh
$48,129
8,832
MMBtu
$(-3,000)
-
$
TOTAL IMPLEMENTED Savings:
$9,657
Cost:
$2,082
- - $9,657 1,772 - - -
-
kWh
$9,657
1,772
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Fuel Oil #6 Administrative Changes Electricity Usage Fuel Oil #6 Administrative Changes