Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1985 |
Principal Product | COATING OF METAL PARTS |
NAICS | n/a |
SIC | 3471 - Plating And Polishing |
Sales | $1,000,000-$5,000,000 |
# of Employees | 35 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 2,080 Thousand Gallons |
Production Hrs. Annual | 3,120 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $58,976 | 745,897 | kWh | $0.08 |
Natural Gas | $1,258 | 181 | MMBtu | $6.95 |
Fuel Oil #4 | $10,324 | 1,675 | MMBtu | $6.16 |
TOTAL ENERGY COSTS | $70,558 | |||
RECOMMENDED SAVINGS* | $15,679 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,622 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Fuel Oil #4 | Administrative Changes | Electricity Usage | Natural Gas | Fuel Oil #4 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $787 Cost: $450 |
$787 | 9,965 | - | - | - | - | - | - |
$787 9,965 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $756 Cost: $750 |
- | - | - | - | $756 | 124 | - | - |
- - kWh |
- - MMBtu |
$756 124 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $5,100 Cost: $5,110 |
$7,887 | 99,941 | $(-2,787) | (-401) | - | - | - | - |
$7,887 99,941 kWh |
$(-2,787) (-401) MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,515 Cost: $2,816 |
- | - | $1,515 | 218 | - | - | - | - |
- - kWh |
$1,515 218 MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $4,896 Cost: $7,546 |
$(-116) | (-1,465) | - | - | $5,012 | 819 | - | - |
$(-116) (-1,465) kWh |
- - MMBtu |
$5,012 819 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $661 Cost: $500 |
- | - | - | - | $661 | 108 | - | - |
- - kWh |
- - MMBtu |
$661 108 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $573 Cost: $11 |
$65 | 879 | - | - | $508 | 83 | - | - |
$65 879 kWh |
- - MMBtu |
$508 83 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $546 Cost: $1,329 |
$695 | 8,792 | $(-250) | (-36) | - | - | $101 | - |
$695 8,792 kWh |
$(-250) (-36) MMBtu |
- - MMBtu |
$101 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $845 Cost: $1,100 |
- | - | - | - | $845 | 138 | - | - |
- - kWh |
- - MMBtu |
$845 138 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $15,679 Cost: $19,612 |
$9,318 | 118,112 | $(-1,522) | (-219) | $7,782 | 1,272 | $101 | - | $9,318 118,112 kWh |
$(-1,522) (-219) MMBtu |
$7,782 1,272 MMBtu |
$101 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,622 Cost: $2,811 |
$852 | 10,844 | - | - | $2,770 | 453 | - | - | $852 10,844 kWh |
- - MMBtu |
$2,770 453 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Fuel Oil #4 | Administrative Changes | Electricity Usage | Natural Gas | Fuel Oil #4 | Administrative Changes |