Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1986
Principal Product PROCESSED CHICKEN PARTS
NAICS n/a
SIC 2015 - Poultry Slaughtering And Processing
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 0
Annual Production 4,400,000 Pounds
Production Hrs. Annual 3,900
Location (State) RI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $47,214 516,999 kWh $0.09
LPG $6,597 671 MMBtu $9.83
Fuel Oil #2 $28,605 4,339 MMBtu $6.59
TOTAL ENERGY COSTS $82,416
RECOMMENDED SAVINGS* $33,573 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,347
#|Description Savings
Cost
Status Electricity Usage LPG Fuel Oil #2 Administrative Changes Electricity Usage LPG Fuel Oil #2 Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$187
Cost:
$41
$187 2,052 - - - - - - $187
2,052
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
02: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS Savings:
$589
Cost:
$900
$589 6,448 - - - - - - $589
6,448
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS Savings:
$375
Cost:
-
$375 4,103 - - - - - - $375
4,103
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
04: 3.6121 BURN WASTE PAPER FOR HEAT Savings:
$31,590
Cost:
$40,000
- - - - $18,590 2,821 $13,000 - -
-
kWh
-
-
MMBtu
$18,590
2,821
MMBtu
$13,000
-
$
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$449
Cost:
$1,060
$803 8,792 $(-354) (-36) - - - - $803
8,792
kWh
$(-354)
(-36)
MMBtu
-
-
MMBtu
-
-
$
06: 2.2447 HEAT WATER WITH EXHAUST HEAT Savings:
$383
Cost:
$1,500
- - $383 39 - - - - -
-
kWh
$383
39
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$33,573
Cost:
$43,501
$1,954 21,395 $29 3 $18,590 2,821 $13,000 - $1,954
21,395
kWh
$29
3
MMBtu
$18,590
2,821
MMBtu
$13,000
-
$
TOTAL IMPLEMENTED Savings:
$1,347
Cost:
$2,400
$964 10,551 $383 39 - - - - $964
10,551
kWh
$383
39
MMBtu
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage LPG Fuel Oil #2 Administrative Changes Electricity Usage LPG Fuel Oil #2 Administrative Changes