IAC logo
IAC Assessment: MA0064
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0064
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1986
Principal Product SYNTHETIC THREAD
NAICS n/a
SIC 2299 - Textile Goods, Nec
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 0
Annual Production 2,500,000 Pounds
Production Hrs. Annual 0
Location (State) RI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $376,331 5,058,617 kWh $0.07
Natural Gas $79,303 15,797 MMBtu $5.02
Fuel Oil #6 $24,569 4,578 MMBtu $5.37
TOTAL ENERGY COSTS $480,203
RECOMMENDED SAVINGS* $60,185 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $59,146
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #6 Administrative Changes Electricity Usage Natural Gas Fuel Oil #6 Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$1,039
Cost:
$750
- - $793 158 $246 45 - - -
-
kWh
$793
158
MMBtu
$246
45
MMBtu
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,040
Cost:
$2,900
- - $1,556 310 $484 89 - - -
-
kWh
$1,556
310
MMBtu
$484
89
MMBtu
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$17,162
Cost:
$8,300
$24,100 323,857 $(-6,938) (-1,382) - - - - $24,100
323,857
kWh
$(-6,938)
(-1,382)
MMBtu
-
-
MMBtu
-
-
$
04: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$900
Cost:
$2,090
- - $900 180 - - - - -
-
kWh
$900
180
MMBtu
-
-
MMBtu
-
-
$
05: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$26,958
Cost:
$10,450
- - $22,945 4,571 $7,013 1,289 $(-3,000) - -
-
kWh
$22,945
4,571
MMBtu
$7,013
1,289
MMBtu
$(-3,000)
-
$
06: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$12,086
Cost:
$31,425
$12,086 162,368 - - - - - - $12,086
162,368
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$60,185
Cost:
$55,915
$36,186 486,225 $19,256 3,837 $7,743 1,423 $(-3,000) - $36,186
486,225
kWh
$19,256
3,837
MMBtu
$7,743
1,423
MMBtu
$(-3,000)
-
$
TOTAL IMPLEMENTED Savings:
$59,146
Cost:
$55,165
$36,186 486,225 $18,463 3,679 $7,497 1,378 $(-3,000) - $36,186
486,225
kWh
$18,463
3,679
MMBtu
$7,497
1,378
MMBtu
$(-3,000)
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Fuel Oil #6 Administrative Changes Electricity Usage Natural Gas Fuel Oil #6 Administrative Changes