Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1986 |
Principal Product | SYNTHETIC THREAD |
NAICS | n/a |
SIC | 2299 - Textile Goods, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 160 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 2,500,000 Pounds |
Production Hrs. Annual | 0 |
Location (State) | RI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $376,331 | 5,058,617 | kWh | $0.07 |
Natural Gas | $79,303 | 15,797 | MMBtu | $5.02 |
Fuel Oil #6 | $24,569 | 4,578 | MMBtu | $5.37 |
TOTAL ENERGY COSTS | $480,203 | |||
RECOMMENDED SAVINGS* | $60,185 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $59,146 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Fuel Oil #6 | Administrative Changes | Electricity Usage | Natural Gas | Fuel Oil #6 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE |
Savings: $1,039 Cost: $750 |
- | - | $793 | 158 | $246 | 45 | - | - |
- - kWh |
$793 158 MMBtu |
$246 45 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $2,040 Cost: $2,900 |
- | - | $1,556 | 310 | $484 | 89 | - | - |
- - kWh |
$1,556 310 MMBtu |
$484 89 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $17,162 Cost: $8,300 |
$24,100 | 323,857 | $(-6,938) | (-1,382) | - | - | - | - |
$24,100 323,857 kWh |
$(-6,938) (-1,382) MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR |
Savings: $900 Cost: $2,090 |
- | - | $900 | 180 | - | - | - | - |
- - kWh |
$900 180 MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $26,958 Cost: $10,450 |
- | - | $22,945 | 4,571 | $7,013 | 1,289 | $(-3,000) | - |
- - kWh |
$22,945 4,571 MMBtu |
$7,013 1,289 MMBtu |
$(-3,000) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
Savings: $12,086 Cost: $31,425 |
$12,086 | 162,368 | - | - | - | - | - | - |
$12,086 162,368 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $60,185 Cost: $55,915 |
$36,186 | 486,225 | $19,256 | 3,837 | $7,743 | 1,423 | $(-3,000) | - | $36,186 486,225 kWh |
$19,256 3,837 MMBtu |
$7,743 1,423 MMBtu |
$(-3,000) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $59,146 Cost: $55,165 |
$36,186 | 486,225 | $18,463 | 3,679 | $7,497 | 1,378 | $(-3,000) | - | $36,186 486,225 kWh |
$18,463 3,679 MMBtu |
$7,497 1,378 MMBtu |
$(-3,000) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Fuel Oil #6 | Administrative Changes | Electricity Usage | Natural Gas | Fuel Oil #6 | Administrative Changes |