Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1987
Principal Product ENVELOPES
NAICS n/a
SIC 2677 - Envelopes
Sales $10,000,000-$50,000,000
# of Employees 500
Plant Area (Sq.Ft.) 0
Annual Production 30,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $394,455 5,330,012 kWh $0.07
Natural Gas $5,265 689 MMBtu $7.64
Fuel Oil #2 $25,188 5,880 MMBtu $4.28
TOTAL ENERGY COSTS $424,908
RECOMMENDED SAVINGS* $15,617 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,444
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Administrative Changes Electricity Usage Fuel Oil #2 Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,938
Cost:
$785
$4,938 66,530 - - - - $4,938
66,530
kWh
-
-
MMBtu
-
-
$
02: 2.6232 INSTALL SET-BACK TIMERS Savings:
$3,744
Cost:
$450
$3,744 50,703 - - - - $3,744
50,703
kWh
-
-
MMBtu
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$916
Cost:
$250
$916 12,309 - - - - $916
12,309
kWh
-
-
MMBtu
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,650
Cost:
-
$3,650 49,238 - - - - $3,650
49,238
kWh
-
-
MMBtu
-
-
$
05: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$1,429
Cost:
$4,000
$1,429 19,343 - - - - $1,429
19,343
kWh
-
-
MMBtu
-
-
$
06: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$940
Cost:
$900
- - $1,840 430 $(-900) - -
-
kWh
$1,840
430
MMBtu
$(-900)
-
$
TOTAL RECOMMENDED Savings:
$15,617
Cost:
$6,385
$14,677 198,123 $1,840 430 $(-900) - $14,677
198,123
kWh
$1,840
430
MMBtu
$(-900)
-
$
TOTAL IMPLEMENTED Savings:
$10,444
Cost:
$1,935
$9,504 128,077 $1,840 430 $(-900) - $9,504
128,077
kWh
$1,840
430
MMBtu
$(-900)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Fuel Oil #2 Administrative Changes Electricity Usage Fuel Oil #2 Administrative Changes