IAC Assessment: MA0106
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0106
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1987
Principal Product UTENSIL & HOLLOWWARE
NAICS n/a
SIC 3914 - Silverware And Plated Ware
Sales $10,000,000-$50,000,000
# of Employees 145
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 2,205
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $60,743 827,374 kWh $0.07
Natural Gas $3,024 401 MMBtu $7.54
Fuel Oil #6 $28,838 10,407 MMBtu $2.77
TOTAL ENERGY COSTS $92,605
RECOMMENDED SAVINGS* $6,035 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,968
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #6 Administrative Changes Electricity Usage Fuel Oil #6 Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$334
Cost:
$129
$334 4,689 - - - - $334
4,689
kWh
-
-
MMBtu
-
-
$
02: 2.2491 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING Savings:
$429
Cost:
$1,250
$(-86) (-1,172) $515 186 - - $(-86)
(-1,172)
kWh
$515
186
MMBtu
-
-
$
03: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$1,717
Cost:
$3,445
- - $2,226 803 $(-509) - -
-
kWh
$2,226
803
MMBtu
$(-509)
-
$
04: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE Savings:
$2,134
Cost:
$5,370
- - $2,134 770 - - -
-
kWh
$2,134
770
MMBtu
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$504
Cost:
$1,497
- - $504 182 - - -
-
kWh
$504
182
MMBtu
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$917
Cost:
-
$917 12,603 - - - - $917
12,603
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$6,035
Cost:
$11,691
$1,165 16,120 $5,379 1,941 $(-509) - $1,165
16,120
kWh
$5,379
1,941
MMBtu
$(-509)
-
$
TOTAL IMPLEMENTED Savings:
$2,968
Cost:
$3,574
$1,251 17,292 $2,226 803 $(-509) - $1,251
17,292
kWh
$2,226
803
MMBtu
$(-509)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Fuel Oil #6 Administrative Changes Electricity Usage Fuel Oil #6 Administrative Changes