Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1988 |
Principal Product | ELECTRIC POWER SUPPLIES |
NAICS | n/a |
SIC | 3612 - Transformers, Except Electronic |
Sales | $10,000,000-$50,000,000 |
# of Employees | 115 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 6,000 Pieces |
Production Hrs. Annual | 2,040 |
Location (State) | CT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $153,618 | 1,958,089 | kWh | $0.08 |
Fuel Oil #2 | $12,600 | 3,402 | MMBtu | $3.70 |
TOTAL ENERGY COSTS | $166,218 | |||
RECOMMENDED SAVINGS* | $11,232 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,237 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #2 | Administrative Changes | Electricity Usage | Fuel Oil #2 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7314 REDUCE VENTILATION AIR |
Savings: $1,763 Cost: $8 |
$91 | 1,172 | $1,672 | 452 | - | - |
$91 1,172 kWh |
$1,672 452 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $474 Cost: - |
- | - | $666 | 180 | $(-192) | - |
- - kWh |
$666 180 MMBtu |
$(-192) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,486 Cost: $1,102 |
$3,486 | 44,549 | - | - | - | - |
$3,486 44,549 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2491 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING |
Savings: $3,344 Cost: $8,408 |
$(-160) | (-2,052) | $3,504 | 947 | - | - |
$(-160) (-2,052) kWh |
$3,504 947 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $90 Cost: $75 |
$90 | 1,172 | - | - | - | - |
$90 1,172 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE |
Savings: $2,075 Cost: $2,000 |
$2,075 | 26,377 | - | - | - | - |
$2,075 26,377 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $11,232 Cost: $11,593 |
$5,582 | 71,218 | $5,842 | 1,579 | $(-192) | - | $5,582 71,218 kWh |
$5,842 1,579 MMBtu |
$(-192) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,237 Cost: $8 |
$91 | 1,172 | $2,338 | 632 | $(-192) | - | $91 1,172 kWh |
$2,338 632 MMBtu |
$(-192) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #2 | Administrative Changes | Electricity Usage | Fuel Oil #2 | Administrative Changes |