Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1988 |
Principal Product | MEMBRANE FILTERS & EQUIPMENT |
NAICS | n/a |
SIC | 3569 - General Industrial Machinery, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 0 Units |
Production Hrs. Annual | 2,125 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $183,454 | 2,383,060 | kWh | $0.08 |
LPG | $8,263 | 970 | MMBtu | $8.52 |
Fuel Oil #2 | $10,740 | 2,675 | MMBtu | $4.01 |
Fuel Oil #4 | $16,202 | 4,637 | MMBtu | $3.49 |
TOTAL ENERGY COSTS | $218,659 | |||
RECOMMENDED SAVINGS* | $20,554 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $18,183 |
#|Description |
Savings Cost |
Status | Electricity Usage | LPG | Fuel Oil #2 | Administrative Changes | Electricity Usage | LPG | Fuel Oil #2 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,356 Cost: $10,888 |
$1,356 | 17,585 | - | - | - | - | - | - |
$1,356 17,585 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE |
Savings: $3,355 Cost: $8,000 |
$3,355 | 43,669 | - | - | - | - | - | - |
$3,355 43,669 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $192 Cost: - |
$192 | 2,638 | - | - | - | - | - | - |
$192 2,638 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $9,930 Cost: $23,000 |
$9,930 | - | - | - | - | - | - | - |
$9,930 - kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $419 Cost: $1,250 |
$(-90) | (-1,172) | $509 | 60 | - | - | - | - |
$(-90) (-1,172) kWh |
$509 60 MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $277 Cost: $200 |
$277 | 3,517 | - | - | - | - | - | - |
$277 3,517 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $3,077 Cost: $600 |
- | - | $3,077 | 361 | - | - | - | - |
- - kWh |
$3,077 361 MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7494 INSTALL STORM WINDOWS AND DOORS |
Savings: $1,483 Cost: $1,570 |
- | - | $1,483 | 174 | - | - | - | - |
- - kWh |
$1,483 174 MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $465 Cost: $450 |
- | - | - | - | $1,617 | 403 | $(-1,152) | - |
- - kWh |
- - MMBtu |
$1,617 403 MMBtu |
$(-1,152) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $20,554 Cost: $45,958 |
$15,020 | 66,237 | $5,069 | 595 | $1,617 | 403 | $(-1,152) | - | $15,020 66,237 kWh |
$5,069 595 MMBtu |
$1,617 403 MMBtu |
$(-1,152) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $18,183 Cost: $42,938 |
$14,641 | 61,254 | $3,077 | 361 | $1,617 | 403 | $(-1,152) | - | $14,641 61,254 kWh |
$3,077 361 MMBtu |
$1,617 403 MMBtu |
$(-1,152) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | LPG | Fuel Oil #2 | Administrative Changes | Electricity Usage | LPG | Fuel Oil #2 | Administrative Changes |