IAC Assessment: MA0139
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0139
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1988
Principal Product FILTRATION EQUIPMENT
NAICS n/a
SIC 3569 - General Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 331
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 6,120
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $677,212 10,063,013 kWh $0.07
Fuel Oil #2 $68,035 15,960 MMBtu $4.26
TOTAL ENERGY COSTS $745,247
RECOMMENDED SAVINGS* $64,598 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,909
#|Description Savings
Cost
Status Electricity Usage LPG Fuel Oil #2 Electricity Usage LPG Fuel Oil #2
$ kWh $ MMBtu $ MMBtu
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$6,928
Cost:
$2,859
$2,465 36,635 - - $4,463 1,046 $2,465
36,635
kWh
-
-
MMBtu
$4,463
1,046
MMBtu
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$7,534
Cost:
$85,000
$24,796 368,406 $(-17,262) (-2,509) - - $24,796
368,406
kWh
$(-17,262)
(-2,509)
MMBtu
-
-
MMBtu
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$19,447
Cost:
$9,000
$19,447 82,649 - - - - $19,447
82,649
kWh
-
-
MMBtu
-
-
MMBtu
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$10,222
Cost:
$3,943
$18,123 269,343 $(-7,901) (-1,149) - - $18,123
269,343
kWh
$(-7,901)
(-1,149)
MMBtu
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$20,467
Cost:
$72,797
$20,467 304,220 - - - - $20,467
304,220
kWh
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$64,598
Cost:
$173,599
$85,298 1,061,253 $(-25,163) (-3,658) $4,463 1,046 $85,298
1,061,253
kWh
$(-25,163)
(-3,658)
MMBtu
$4,463
1,046
MMBtu
TOTAL IMPLEMENTED Savings:
$33,909
Cost:
$96,859
$46,708 487,690 $(-17,262) (-2,509) $4,463 1,046 $46,708
487,690
kWh
$(-17,262)
(-2,509)
MMBtu
$4,463
1,046
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage LPG Fuel Oil #2 Electricity Usage LPG Fuel Oil #2