IAC logo
IAC Assessment: MA0141
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0141
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1989
Principal Product MECH. TIMING DEVICES
NAICS n/a
SIC 3625 - Relays And Industrial Controls
Sales $5,000,000-$10,000,000
# of Employees 130
Plant Area (Sq.Ft.) 0
Annual Production 1,500,000 Pieces
Production Hrs. Annual 2,082
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $105,627 1,383,939 kWh $0.08
Natural Gas $15,195 2,267 MMBtu $6.70
Fuel Oil #2 $20,735 4,879 MMBtu $4.25
TOTAL ENERGY COSTS $141,557
RECOMMENDED SAVINGS* $26,425 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,514
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$13,473
Cost:
$65,600
- - $13,473 2,011 -
-
kWh
$13,473
2,011
MMBtu
02: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$6,357
Cost:
$9,450
$6,357 87,925 - - $6,357
87,925
kWh
-
-
MMBtu
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,062
Cost:
$700
$2,062 26,964 - - $2,062
26,964
kWh
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$716
Cost:
$200
$716 9,379 - - $716
9,379
kWh
-
-
MMBtu
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$950
Cost:
$2,200
$1,520 19,930 $(-570) (-85) $1,520
19,930
kWh
$(-570)
(-85)
MMBtu
06: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$961
Cost:
$3,000
$961 12,603 - - $961
12,603
kWh
-
-
MMBtu
07: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$1,906
Cost:
-
$1,906 24,912 - - $1,906
24,912
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$26,425
Cost:
$81,150
$13,522 181,713 $12,903 1,926 $13,522
181,713
kWh
$12,903
1,926
MMBtu
TOTAL IMPLEMENTED Savings:
$24,514
Cost:
$75,950
$11,041 149,180 $13,473 2,011 $11,041
149,180
kWh
$13,473
2,011
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas