Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1989
Principal Product SPECIALTY TISSUE PAPER
NAICS n/a
SIC 2676 - Sanitary Paper Products
Sales $10,000,000-$50,000,000
# of Employees 95
Plant Area (Sq.Ft.) 0
Annual Production 19,635 Tons
Production Hrs. Annual 8,568
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $837,341 15,266,999 kWh $0.05
Natural Gas $514,859 215,736 MMBtu $2.39
TOTAL ENERGY COSTS $1,352,200
RECOMMENDED SAVINGS* $45,377 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $23,703
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,941
Cost:
-
$1,941 35,463 - - $1,941
35,463
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,156
Cost:
$100
$1,156 21,102 - - $1,156
21,102
kWh
-
-
MMBtu
03: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$2,380
Cost:
$4,505
- - $2,380 996 -
-
kWh
$2,380
996
MMBtu
04: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$15,750
Cost:
$10,373
- - $15,750 6,590 -
-
kWh
$15,750
6,590
MMBtu
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$5,452
Cost:
$2,816
- - $5,452 2,282 -
-
kWh
$5,452
2,282
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,544
Cost:
$6,123
- - $3,544 1,483 -
-
kWh
$3,544
1,483
MMBtu
07: 2.3312 INSTALL EFFICIENT RECTIFIERS Savings:
$15,154
Cost:
$20,306
$15,154 276,377 - - $15,154
276,377
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$45,377
Cost:
$44,223
$18,251 332,942 $27,126 11,351 $18,251
332,942
kWh
$27,126
11,351
MMBtu
TOTAL IMPLEMENTED Savings:
$23,703
Cost:
$23,222
$18,251 332,942 $5,452 2,282 $18,251
332,942
kWh
$5,452
2,282
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas