IAC logo
IAC Assessment: MA0148
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0148
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1989
Principal Product MEDICAL KITS
NAICS n/a
SIC 3842 - Surgical Appliances And Supplies
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 0
Annual Production 3,600,000 Pieces
Production Hrs. Annual 8,736
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $80,235 1,032,825 kWh $0.08
Natural Gas $78,948 12,888 MMBtu $6.13
TOTAL ENERGY COSTS $159,183
RECOMMENDED SAVINGS* $22,778 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,693
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.6232 INSTALL SET-BACK TIMERS Savings:
$155
Cost:
$195
$155 2,052 - - - - $155
2,052
kWh
-
-
MMBtu
-
-
$
02: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$4,471
Cost:
$320
- - $5,271 860 $(-800) - -
-
kWh
$5,271
860
MMBtu
$(-800)
-
$
03: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$6,780
Cost:
$7,000
- - $6,780 1,106 - - -
-
kWh
$6,780
1,106
MMBtu
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,515
Cost:
$676
$4,082 52,462 $(-1,567) (-256) - - $4,082
52,462
kWh
$(-1,567)
(-256)
MMBtu
-
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,218
Cost:
$2,730
- - $3,218 525 - - -
-
kWh
$3,218
525
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$726
Cost:
$228
$726 9,379 - - - - $726
9,379
kWh
-
-
MMBtu
-
-
$
07: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$3,059
Cost:
$2,300
- - $3,059 498 - - -
-
kWh
$3,059
498
MMBtu
-
-
$
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$668
Cost:
$529
- - $668 109 - - -
-
kWh
$668
109
MMBtu
-
-
$
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,186
Cost:
$316
- - $1,186 194 - - -
-
kWh
$1,186
194
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$22,778
Cost:
$14,294
$4,963 63,893 $18,615 3,036 $(-800) - $4,963
63,893
kWh
$18,615
3,036
MMBtu
$(-800)
-
$
TOTAL IMPLEMENTED Savings:
$11,693
Cost:
$10,145
- - $11,693 1,907 - - -
-
kWh
$11,693
1,907
MMBtu
-
-
$