Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1989 |
Principal Product | FILTER MEMBRANES |
NAICS | n/a |
SIC | 3569 - General Industrial Machinery, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 300 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 0 Units |
Production Hrs. Annual | 8,736 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $303,612 | 4,745,897 | kWh | $0.06 |
Natural Gas | $24,028 | 4,268 | MMBtu | $5.63 |
Fuel Oil #2 | $104,740 | 25,760 | MMBtu | $4.07 |
TOTAL ENERGY COSTS | $432,380 | |||
RECOMMENDED SAVINGS* | $27,428 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $13,531 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Fuel Oil #2 | Fuel Oil #4 | Electricity Usage | Natural Gas | Fuel Oil #2 | Fuel Oil #4 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $5,228 Cost: $426 |
$5,228 | 81,770 | - | - | - | - | - | - |
$5,228 81,770 kWh |
- - MMBtu |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN |
Savings: $1,218 Cost: $305 |
$1,218 | 19,050 | - | - | - | - | - | - |
$1,218 19,050 kWh |
- - MMBtu |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7291 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS |
Savings: $4,308 Cost: $243 |
- | - | $11,737 | 2,085 | $(-7,429) | (-1,830) | - | - |
- - kWh |
$11,737 2,085 MMBtu |
$(-7,429) (-1,830) MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL |
Savings: $12,509 Cost: $15,150 |
- | - | - | - | $104,967 | 25,781 | $(-92,458) | (-25,781) |
- - kWh |
- - MMBtu |
$104,967 25,781 MMBtu |
$(-92,458) (-25,781) MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE |
Savings: $1,022 Cost: $593 |
- | - | - | - | - | - | $1,022 | 281 |
- - kWh |
- - MMBtu |
- - MMBtu |
$1,022 281 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2428 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC |
Savings: $1,093 Cost: $592 |
- | - | - | - | - | - | $1,093 | 303 |
- - kWh |
- - MMBtu |
- - MMBtu |
$1,093 303 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $2,050 Cost: $3,150 |
- | - | - | - | - | - | $2,050 | 568 |
- - kWh |
- - MMBtu |
- - MMBtu |
$2,050 568 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $27,428 Cost: $20,459 |
$6,446 | 100,820 | $11,737 | 2,085 | $97,538 | 23,951 | $(-88,293) | (-24,629) | $6,446 100,820 kWh |
$11,737 2,085 MMBtu |
$97,538 23,951 MMBtu |
$(-88,293) (-24,629) MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $13,531 Cost: $15,743 |
- | - | - | - | $104,967 | 25,781 | $(-91,436) | (-25,500) | - - kWh |
- - MMBtu |
$104,967 25,781 MMBtu |
$(-91,436) (-25,500) MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Fuel Oil #2 | Fuel Oil #4 | Electricity Usage | Natural Gas | Fuel Oil #2 | Fuel Oil #4 |