IAC logo
IAC Assessment: MA0166
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0166
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1989
Principal Product AUTOMOTIVE BATTERIES
NAICS n/a
SIC 3692 - Primary Batteries, Dry And Wet
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 0
Annual Production 1,500,000 Pieces
Production Hrs. Annual 6,000
Location (State) VT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,124,597 15,167,058 kWh $0.07
LPG $258,237 58,074 MMBtu $4.45
Fuel Oil #2 $22,400 22,400 MMBtu $1.00
TOTAL ENERGY COSTS $1,405,234
RECOMMENDED SAVINGS* $52,647 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,130
#|Description Savings
Cost
Status Electricity Usage LPG Fuel Oil #2 Electricity Usage LPG Fuel Oil #2
$ kWh $ MMBtu $ MMBtu
01: 2.8223 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE Savings:
$19,320
Cost:
$18,000
- - - - $19,320 2,705 -
-
kWh
-
-
MMBtu
$19,320
2,705
MMBtu
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,628
Cost:
$3,450
$4,780 64,478 $(-1,152) (-259) - - $4,780
64,478
kWh
$(-1,152)
(-259)
MMBtu
-
-
MMBtu
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,130
Cost:
$180
$1,130 15,240 - - - - $1,130
15,240
kWh
-
-
MMBtu
-
-
MMBtu
04: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$842
Cost:
$1,700
$842 13,189 - - - - $842
13,189
kWh
-
-
MMBtu
-
-
MMBtu
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$21,230
Cost:
$7,913
$27,967 377,198 $(-6,737) (-1,514) - - $27,967
377,198
kWh
$(-6,737)
(-1,514)
MMBtu
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,497
Cost:
$908
$6,497 87,632 - - - - $6,497
87,632
kWh
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$52,647
Cost:
$32,151
$41,216 557,737 $(-7,889) (-1,773) $19,320 2,705 $41,216
557,737
kWh
$(-7,889)
(-1,773)
MMBtu
$19,320
2,705
MMBtu
TOTAL IMPLEMENTED Savings:
$1,130
Cost:
$180
$1,130 15,240 - - - - $1,130
15,240
kWh
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage LPG Fuel Oil #2 Electricity Usage LPG Fuel Oil #2