IAC Assessment: MA0191
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0191
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1990
Principal Product GRANULATORS & SHREDDERS
NAICS n/a
SIC 3559 - Special Industry Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 114
Plant Area (Sq.Ft.) 0
Annual Production 1,980,000 Pounds
Production Hrs. Annual 2,470
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $96,483 1,168,230 kWh $0.08
Natural Gas $26,569 4,242 MMBtu $6.26
Fuel Oil #2 $8,495 1,532 MMBtu $5.55
Fuel Oil #4 $10,862 2,362 MMBtu $4.60
TOTAL ENERGY COSTS $142,409
RECOMMENDED SAVINGS* $21,338 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,501
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #4 Administrative Changes Electricity Usage Natural Gas Fuel Oil #4 Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$1,017
Cost:
$1,992
- - - - $3,168 693 $(-2,151) - -
-
kWh
-
-
MMBtu
$3,168
693
MMBtu
$(-2,151)
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,754
Cost:
$9,230
$4,754 5,862 - - - - - - $4,754
5,862
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,162
Cost:
$476
$1,205 56,565 $(-43) (-2) - - - - $1,205
56,565
kWh
$(-43)
(-2)
MMBtu
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,066
Cost:
$4,648
$7,066 85,580 - - - - - - $7,066
85,580
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$7,339
Cost:
$3,720
- - - - $7,339 1,606 - - -
-
kWh
-
-
MMBtu
$7,339
1,606
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$21,338
Cost:
$20,066
$13,025 148,007 $(-43) (-2) $10,507 2,299 $(-2,151) - $13,025
148,007
kWh
$(-43)
(-2)
MMBtu
$10,507
2,299
MMBtu
$(-2,151)
-
$
TOTAL IMPLEMENTED Savings:
$8,501
Cost:
$4,196
$1,205 56,565 $(-43) (-2) $7,339 1,606 - - $1,205
56,565
kWh
$(-43)
(-2)
MMBtu
$7,339
1,606
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Fuel Oil #4 Administrative Changes Electricity Usage Natural Gas Fuel Oil #4 Administrative Changes