Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1990 |
Principal Product | GRANULATORS & SHREDDERS |
NAICS | n/a |
SIC | 3559 - Special Industry Machinery, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 114 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 1,980,000 Pounds |
Production Hrs. Annual | 2,470 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $96,483 | 1,168,230 | kWh | $0.08 |
Natural Gas | $26,569 | 4,242 | MMBtu | $6.26 |
Fuel Oil #2 | $8,495 | 1,532 | MMBtu | $5.55 |
Fuel Oil #4 | $10,862 | 2,362 | MMBtu | $4.60 |
TOTAL ENERGY COSTS | $142,409 | |||
RECOMMENDED SAVINGS* | $21,338 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $8,501 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Fuel Oil #4 | Administrative Changes | Electricity Usage | Natural Gas | Fuel Oil #4 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $1,017 Cost: $1,992 |
- | - | - | - | $3,168 | 693 | $(-2,151) | - |
- - kWh |
- - MMBtu |
$3,168 693 MMBtu |
$(-2,151) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $4,754 Cost: $9,230 |
$4,754 | 5,862 | - | - | - | - | - | - |
$4,754 5,862 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,162 Cost: $476 |
$1,205 | 56,565 | $(-43) | (-2) | - | - | - | - |
$1,205 56,565 kWh |
$(-43) (-2) MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $7,066 Cost: $4,648 |
$7,066 | 85,580 | - | - | - | - | - | - |
$7,066 85,580 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7229 AIR CONDITION ONLY SPACE NECESSARY |
Savings: $7,339 Cost: $3,720 |
- | - | - | - | $7,339 | 1,606 | - | - |
- - kWh |
- - MMBtu |
$7,339 1,606 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $21,338 Cost: $20,066 |
$13,025 | 148,007 | $(-43) | (-2) | $10,507 | 2,299 | $(-2,151) | - | $13,025 148,007 kWh |
$(-43) (-2) MMBtu |
$10,507 2,299 MMBtu |
$(-2,151) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $8,501 Cost: $4,196 |
$1,205 | 56,565 | $(-43) | (-2) | $7,339 | 1,606 | - | - | $1,205 56,565 kWh |
$(-43) (-2) MMBtu |
$7,339 1,606 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Fuel Oil #4 | Administrative Changes | Electricity Usage | Natural Gas | Fuel Oil #4 | Administrative Changes |