IAC logo
IAC Assessment: MA0193
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0193
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1990
Principal Product THERMISTORS
NAICS n/a
SIC 3823 - Process Control Instruments
Sales $10,000,000-$50,000,000
# of Employees 270
Plant Area (Sq.Ft.) 0
Annual Production 120,000 Pieces
Production Hrs. Annual 3,120
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $207,268 3,272,861 kWh $0.06
Natural Gas $23,794 3,770 MMBtu $6.31
TOTAL ENERGY COSTS $231,062
RECOMMENDED SAVINGS* $73,353 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $46,891
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$984
Cost:
$426
$984 15,533 - - $984
15,533
kWh
-
-
MMBtu
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$13,252
Cost:
$12,000
$22,086 348,769 $(-8,834) (-1,400) $22,086
348,769
kWh
$(-8,834)
(-1,400)
MMBtu
03: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$40,469
Cost:
$5,400
$29,232 461,606 $11,237 1,467 $29,232
461,606
kWh
$11,237
1,467
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$173
Cost:
$348
$207 13,189 $(-34) (-22) $207
13,189
kWh
$(-34)
(-22)
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$13,037
Cost:
$2,609
$2,543 40,152 $10,494 1,663 $2,543
40,152
kWh
$10,494
1,663
MMBtu
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$5,438
Cost:
-
$5,438 85,873 - - $5,438
85,873
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$73,353
Cost:
$20,783
$60,490 965,122 $12,863 1,708 $60,490
965,122
kWh
$12,863
1,708
MMBtu
TOTAL IMPLEMENTED Savings:
$46,891
Cost:
$5,826
$35,654 563,012 $11,237 1,467 $35,654
563,012
kWh
$11,237
1,467
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas