IAC logo
IAC Assessment: MA0222
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0222
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1991
Principal Product PAINT BRUSHES & ROLLERS
NAICS n/a
SIC 3991 - Brooms And Brushes
Sales $10,000,000-$50,000,000
# of Employees 154
Plant Area (Sq.Ft.) 0
Annual Production 12,900,000 Pieces
Production Hrs. Annual 3,555
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $84,140 1,028,136 kWh $0.08
LPG $15,125 2,538 MMBtu $5.96
TOTAL ENERGY COSTS $99,265
RECOMMENDED SAVINGS* $6,515 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,032
#|Description Savings
Cost
Status Electricity Usage LPG Electricity Usage LPG
$ kWh $ MMBtu
01: 2.7316 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN Savings:
$3,224
Cost:
$1,980
$912 11,137 $2,312 388 $912
11,137
kWh
$2,312
388
MMBtu
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$2,144
Cost:
$500
$(-1,677) (-20,516) $3,821 641 $(-1,677)
(-20,516)
kWh
$3,821
641
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$215
Cost:
$1,419
$215 2,638 - - $215
2,638
kWh
-
-
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$504
Cost:
-
$504 6,155 - - $504
6,155
kWh
-
-
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$259
Cost:
$181
$259 3,224 - - $259
3,224
kWh
-
-
MMBtu
06: 2.7316 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN Savings:
$169
Cost:
$78
$169 4,982 - - $169
4,982
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$6,515
Cost:
$4,158
$382 7,620 $6,133 1,029 $382
7,620
kWh
$6,133
1,029
MMBtu
TOTAL IMPLEMENTED Savings:
$3,032
Cost:
$1,997
$(-789) (-6,741) $3,821 641 $(-789)
(-6,741)
kWh
$3,821
641
MMBtu