IAC Assessment: MA0223
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0223
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1991
Principal Product PRECISION MACHINING
NAICS n/a
SIC 3544 - Special Dies, Tools, Jigs & Fixtures
Sales $5,000,000-$10,000,000
# of Employees 75
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 6,288
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $92,973 1,127,784 kWh $0.08
Natural Gas $2,635 353 MMBtu $7.46
TOTAL ENERGY COSTS $95,608
RECOMMENDED SAVINGS* $11,627 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,230
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$3,884
Cost:
$1,100
- - $3,884 520 - - -
-
kWh
$3,884
520
MMBtu
-
-
$
02: 2.6232 INSTALL SET-BACK TIMERS Savings:
$2,810
Cost:
$220
$2,810 34,291 - - - - $2,810
34,291
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$399
Cost:
$11,600
$1,071 13,189 - - $(-672) - $1,071
13,189
kWh
-
-
MMBtu
$(-672)
-
$
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$532
Cost:
$265
$532 6,448 - - - - $532
6,448
kWh
-
-
MMBtu
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,144
Cost:
$600
- - $2,144 287 - - -
-
kWh
$2,144
287
MMBtu
-
-
$
06: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$968
Cost:
$100
$48 586 $920 122 - - $48
586
kWh
$920
122
MMBtu
-
-
$
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$721
Cost:
$1,495
$721 8,792 - - - - $721
8,792
kWh
-
-
MMBtu
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$169
Cost:
$100
$169 2,052 - - - - $169
2,052
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$11,627
Cost:
$15,480
$5,351 65,358 $6,948 929 $(-672) - $5,351
65,358
kWh
$6,948
929
MMBtu
$(-672)
-
$
TOTAL IMPLEMENTED Savings:
$8,230
Cost:
$13,120
$4,098 50,118 $4,804 642 $(-672) - $4,098
50,118
kWh
$4,804
642
MMBtu
$(-672)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes