Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1991 |
Principal Product | NON-WOVEN FABRICS |
NAICS | n/a |
SIC | 2299 - Textile Goods, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 27,900 Thousand Feet |
Production Hrs. Annual | 7,488 |
Location (State) | NH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $563,915 | 7,590,856 | kWh | $0.07 |
LPG | $131,238 | 25,003 | MMBtu | $5.25 |
Fuel Oil #6 | $138,957 | 43,398 | MMBtu | $3.20 |
TOTAL ENERGY COSTS | $834,110 | |||
RECOMMENDED SAVINGS* | $179,558 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $32,693 |
#|Description |
Savings Cost |
Status | Electricity Usage | LPG | Fuel Oil #6 | Administrative Changes | Electricity Usage | LPG | Fuel Oil #6 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $46,881 Cost: - |
$56,316 | 758,206 | $(-9,435) | (-1,797) | - | - | - | - |
$56,316 758,206 kWh |
$(-9,435) (-1,797) MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $71,552 Cost: - |
$88,325 | 1,189,039 | $(-16,773) | (-3,195) | - | - | - | - |
$88,325 1,189,039 kWh |
$(-16,773) (-3,195) MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS |
Savings: $25,667 Cost: $19,927 |
- | - | $25,667 | 4,889 | - | - | - | - |
- - kWh |
$25,667 4,889 MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $21,213 Cost: $35,000 |
- | - | - | - | $24,093 | 7,529 | $(-2,880) | - |
- - kWh |
- - MMBtu |
$24,093 7,529 MMBtu |
$(-2,880) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $8,079 Cost: $16,200 |
$8,079 | 108,734 | - | - | - | - | - | - |
$8,079 108,734 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,765 Cost: $1,500 |
$2,765 | 37,222 | - | - | - | - | - | - |
$2,765 37,222 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,859 Cost: $2,250 |
- | - | - | - | $1,859 | 581 | - | - |
- - kWh |
- - MMBtu |
$1,859 581 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $1,542 Cost: $1,060 |
- | - | - | - | $1,542 | 482 | - | - |
- - kWh |
- - MMBtu |
$1,542 482 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $179,558 Cost: $75,937 |
$155,485 | 2,093,201 | $(-541) | (-103) | $27,494 | 8,592 | $(-2,880) | - | $155,485 2,093,201 kWh |
$(-541) (-103) MMBtu |
$27,494 8,592 MMBtu |
$(-2,880) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $32,693 Cost: $54,510 |
$8,079 | 108,734 | - | - | $27,494 | 8,592 | $(-2,880) | - | $8,079 108,734 kWh |
- - MMBtu |
$27,494 8,592 MMBtu |
$(-2,880) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | LPG | Fuel Oil #6 | Administrative Changes | Electricity Usage | LPG | Fuel Oil #6 | Administrative Changes |