IAC logo
IAC Assessment: MA0226
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0226
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1991
Principal Product LITHOGRAPHIC PLATES
NAICS n/a
SIC 2796 - Platemaking Services
Sales $10,000,000-$50,000,000
# of Employees 135
Plant Area (Sq.Ft.) 0
Annual Production 43,700 Thousand Feet
Production Hrs. Annual 7,224
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $459,802 7,057,738 kWh $0.07
Natural Gas $81,399 10,136 MMBtu $8.03
TOTAL ENERGY COSTS $541,201
RECOMMENDED SAVINGS* $29,951 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,951
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE Savings:
$11,242
Cost:
$21,238
- - $11,242 1,400 -
-
kWh
$11,242
1,400
MMBtu
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$6,376
Cost:
-
$6,376 97,890 - - $6,376
97,890
kWh
-
-
MMBtu
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$5,696
Cost:
-
$11,454 175,850 $(-5,758) (-717) $11,454
175,850
kWh
$(-5,758)
(-717)
MMBtu
04: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$3,079
Cost:
$9,000
$76 1,172 $3,003 374 $76
1,172
kWh
$3,003
374
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,303
Cost:
$856
$3,303 50,703 - - $3,303
50,703
kWh
-
-
MMBtu
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$255
Cost:
$3,020
$255 4,103 - - $255
4,103
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$29,951
Cost:
$34,114
$21,464 329,718 $8,487 1,057 $21,464
329,718
kWh
$8,487
1,057
MMBtu
TOTAL IMPLEMENTED Savings:
$29,951
Cost:
$34,114
$21,464 329,718 $8,487 1,057 $21,464
329,718
kWh
$8,487
1,057
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas