Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1992 |
Principal Product | RECYCLABLE PAPER |
NAICS | n/a |
SIC | 2621 - Paper Mills |
Sales | $5,000,000-$10,000,000 |
# of Employees | 30 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 13,000 Tons |
Production Hrs. Annual | 6,240 |
Location (State) | NH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $775,711 | 10,079,133 | kWh | $0.08 |
Fuel Oil #6 | $213,359 | 85,343 | MMBtu | $2.50 |
TOTAL ENERGY COSTS | $989,070 | |||
RECOMMENDED SAVINGS* | $160,136 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $118,305 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #6 | Administrative Changes | Electricity Usage | Fuel Oil #6 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $95,700 Cost: $153,525 |
$95,700 | 1,243,259 | - | - | - | - |
$95,700 1,243,259 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR |
Savings: $38,424 Cost: $77,755 |
$(-12,566) | (-163,247) | $50,990 | 20,396 | - | - |
$(-12,566) (-163,247) kWh |
$50,990 20,396 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $13,505 Cost: $24,600 |
- | - | $13,505 | 5,402 | - | - |
- - kWh |
$13,505 5,402 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $9,100 Cost: $3,720 |
- | - | $9,100 | 3,640 | - | - |
- - kWh |
$9,100 3,640 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE |
Savings: $2,845 Cost: $4,162 |
- | - | $2,845 | 1,138 | - | - |
- - kWh |
$2,845 1,138 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $562 Cost: - |
$779 | 10,258 | - | - | $(-217) | - |
$779 10,258 kWh |
- - MMBtu |
$(-217) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $160,136 Cost: $263,762 |
$83,913 | 1,090,270 | $76,440 | 30,576 | $(-217) | - | $83,913 1,090,270 kWh |
$76,440 30,576 MMBtu |
$(-217) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $118,305 Cost: $181,845 |
$95,700 | 1,243,259 | $22,605 | 9,042 | - | - | $95,700 1,243,259 kWh |
$22,605 9,042 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #6 | Administrative Changes | Electricity Usage | Fuel Oil #6 | Administrative Changes |