Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1992 |
Principal Product | ALLERGIC DIAGNOSTIC SETS |
NAICS | n/a |
SIC | 2835 - Diagnostic Substances |
Sales | $10,000,000-$50,000,000 |
# of Employees | 125 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 0 Units |
Production Hrs. Annual | 2,340 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $141,846 | 1,646,542 | kWh | $0.09 |
Fuel Oil #2 | $1,455 | 293 | MMBtu | $4.97 |
Other Energy | $21,552 | 2,867 | MMBtu | $7.52 |
TOTAL ENERGY COSTS | $164,853 | |||
RECOMMENDED SAVINGS* | $19,554 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $18,106 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #2 | Other Energy | Electricity Usage | Fuel Oil #2 | Other Energy | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7229 AIR CONDITION ONLY SPACE NECESSARY |
Savings: $6,633 Cost: - |
$2,172 | 25,205 | $4,461 | 612 | - | - |
$2,172 25,205 kWh |
$4,461 612 MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4321 UPGRADE OBSOLETE EQUIPMENT |
Savings: $5,505 Cost: $61,500 |
$5,505 | 63,892 | - | - | - | - |
$5,505 63,892 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1392 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE |
Savings: $4,762 Cost: $75 |
- | - | $(-16,798) | (-3,373) | $21,560 | 2,867 |
- - kWh |
$(-16,798) (-3,373) MMBtu |
$21,560 2,867 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION |
Savings: $1,145 Cost: - |
$740 | 8,499 | $405 | 56 | - | - |
$740 8,499 kWh |
$405 56 MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $1,206 Cost: $1,265 |
$280 | 3,224 | $926 | 127 | - | - |
$280 3,224 kWh |
$926 127 MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $303 Cost: $386 |
$303 | 3,517 | - | - | - | - |
$303 3,517 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $19,554 Cost: $63,226 |
$9,000 | 104,337 | $(-11,006) | (-2,578) | $21,560 | 2,867 | $9,000 104,337 kWh |
$(-11,006) (-2,578) MMBtu |
$21,560 2,867 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $18,106 Cost: $62,840 |
$7,957 | 92,321 | $(-11,411) | (-2,634) | $21,560 | 2,867 | $7,957 92,321 kWh |
$(-11,411) (-2,634) MMBtu |
$21,560 2,867 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #2 | Other Energy | Electricity Usage | Fuel Oil #2 | Other Energy |