IAC logo
IAC Assessment: MA0243
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0243
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1992
Principal Product HEAVY MACHINERY
NAICS n/a
SIC 3559 - Special Industry Machinery, Nec
Sales $50,000,000-$100,000,000
# of Employees 150
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 4,290
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $226,535 2,235,053 kWh $0.10
Natural Gas $77,754 14,889 MMBtu $5.22
Fuel Oil #6 $53,544 15,034 MMBtu $3.56
TOTAL ENERGY COSTS $357,833
RECOMMENDED SAVINGS* $48,197 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $39,134
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Fuel Oil #6 Administrative Changes Electricity Usage Natural Gas Fuel Oil #2 Fuel Oil #6 Administrative Changes
$ kWh $ MMBtu $ MMBtu $ MMBtu $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,894
Cost:
$33
$12,894 127,198 - - - - - - - - $12,894
127,198
kWh
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
02: 2.6124 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE Savings:
$11,199
Cost:
$1,500
- - $6,265 1,276 - - $4,934 1,386 - - -
-
kWh
$6,265
1,276
MMBtu
-
-
MMBtu
$4,934
1,386
MMBtu
-
-
$
03: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$12,146
Cost:
$200
- - $6,795 1,384 - - $5,351 1,503 - - -
-
kWh
$6,795
1,384
MMBtu
-
-
MMBtu
$5,351
1,503
MMBtu
-
-
$
04: 2.7423 REDUCE HEAT GAIN BY WINDOW TINTING Savings:
$5,744
Cost:
$5,800
- - - - $3,159 523 $2,585 330 - - -
-
kWh
-
-
MMBtu
$3,159
523
MMBtu
$2,585
330
MMBtu
-
-
$
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,319
Cost:
-
$3,981 39,273 - - - - $(-662) (-186) - - $3,981
39,273
kWh
-
-
MMBtu
-
-
MMBtu
$(-662)
(-186)
MMBtu
-
-
$
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$980
Cost:
$4
$980 9,672 - - - - - - - - $980
9,672
kWh
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$785
Cost:
$1
- - $776 158 - - $609 171 $(-600) - -
-
kWh
$776
158
MMBtu
-
-
MMBtu
$609
171
MMBtu
$(-600)
-
$
08: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$365
Cost:
$220
- - $205 42 - - $160 45 - - -
-
kWh
$205
42
MMBtu
-
-
MMBtu
$160
45
MMBtu
-
-
$
09: 2.6232 INSTALL SET-BACK TIMERS Savings:
$468
Cost:
$180
$468 4,689 - - - - - - - - $468
4,689
kWh
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$297
Cost:
$400
$297 2,931 - - - - - - - - $297
2,931
kWh
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$48,197
Cost:
$8,338
$18,620 183,763 $14,041 2,860 $3,159 523 $12,977 3,249 $(-600) - $18,620
183,763
kWh
$14,041
2,860
MMBtu
$3,159
523
MMBtu
$12,977
3,249
MMBtu
$(-600)
-
$
TOTAL IMPLEMENTED Savings:
$39,134
Cost:
$2,538
$14,639 144,490 $14,041 2,860 - - $11,054 3,105 $(-600) - $14,639
144,490
kWh
$14,041
2,860
MMBtu
-
-
MMBtu
$11,054
3,105
MMBtu
$(-600)
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Fuel Oil #2 Fuel Oil #6 Administrative Changes Electricity Usage Natural Gas Fuel Oil #2 Fuel Oil #6 Administrative Changes