IAC logo
IAC Assessment: MA0279
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0279
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1993
Principal Product Special order plasma coa
NAICS n/a
SIC 3471 - Plating And Polishing
Sales $1,000,000-$5,000,000
# of Employees 48
Plant Area (Sq.Ft.) 27,000
Annual Production 0 Units
Production Hrs. Annual 4,692
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $149,804 1,315,358 kWh $0.11
Fuel Oil #2 $21,748 3,980 MMBtu $5.46
TOTAL ENERGY COSTS $171,552
RECOMMENDED SAVINGS* $18,091 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,082
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2
$ kWh $ MMBtu $ MMBtu
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$11,082
Cost:
$2,800
$11,082 97,304 - - - - $11,082
97,304
kWh
-
-
MMBtu
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,408
Cost:
$23,620
$5,408 47,479 - - - - $5,408
47,479
kWh
-
-
MMBtu
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$567
Cost:
$170
$567 4,982 - - - - $567
4,982
kWh
-
-
MMBtu
-
-
MMBtu
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$(-3,869)
Cost:
$18,000
$(-5,241) (-46,014) $1,372 196 - - $(-5,241)
(-46,014)
kWh
$1,372
196
MMBtu
-
-
MMBtu
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$2,266
Cost:
$143
- - - - $2,266 415 -
-
kWh
-
-
MMBtu
$2,266
415
MMBtu
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,003
Cost:
$1,560
$2,003 17,585 - - - - $2,003
17,585
kWh
-
-
MMBtu
-
-
MMBtu
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$634
Cost:
$68
$634 5,569 - - - - $634
5,569
kWh
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$18,091
Cost:
$46,361
$14,453 126,905 $1,372 196 $2,266 415 $14,453
126,905
kWh
$1,372
196
MMBtu
$2,266
415
MMBtu
TOTAL IMPLEMENTED Savings:
$11,082
Cost:
$2,800
$11,082 97,304 - - - - $11,082
97,304
kWh
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2