Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1993 |
Principal Product | Hand tools,containers an |
NAICS | n/a |
SIC | 3399 - Primary Metal Products, Nec |
Sales | $1,000,000-$5,000,000 |
# of Employees | 33 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 0 Units |
Production Hrs. Annual | 2,496 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $30,202 | 237,691 | kWh | $0.13 |
Fuel Oil #2 | $11,419 | 2,274 | MMBtu | $5.02 |
TOTAL ENERGY COSTS | $41,621 | |||
RECOMMENDED SAVINGS* | $10,327 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $9,396 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #2 | Water Consumption | Electricity Usage | Fuel Oil #2 | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,690 Cost: $435 |
$3,690 | 29,015 | - | - | - | - |
$3,690 29,015 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $3,380 Cost: $6,000 |
$3,380 | - | - | - | - | - |
$3,380 - kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.4115 RECOVER AND REUSE COOLING WATER |
Savings: $1,407 Cost: $200 |
$(-75) | (-586) | - | - | $1,482 | - |
$(-75) (-586) kWh |
- - MMBtu |
$1,482 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $596 Cost: $710 |
$596 | 4,689 | - | - | - | - |
$596 4,689 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES |
Savings: $548 Cost: $151 |
$548 | 9,379 | - | - | - | - |
$548 9,379 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $371 Cost: $400 |
- | - | $371 | 74 | - | - |
- - kWh |
$371 74 MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $335 Cost: - |
$335 | 2,638 | - | - | - | - |
$335 2,638 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $10,327 Cost: $7,896 |
$8,474 | 45,135 | $371 | 74 | $1,482 | - | $8,474 45,135 kWh |
$371 74 MMBtu |
$1,482 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $9,396 Cost: $7,186 |
$7,543 | 37,808 | $371 | 74 | $1,482 | - | $7,543 37,808 kWh |
$371 74 MMBtu |
$1,482 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #2 | Water Consumption | Electricity Usage | Fuel Oil #2 | Water Consumption |