IAC logo
IAC Assessment: MA0285
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0285
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1993
Principal Product drafting paper
NAICS n/a
SIC 3952 - Lead Pencils And Art Goods
Sales $10,000,000-$50,000,000
# of Employees 101
Plant Area (Sq.Ft.) 108,000
Annual Production 37,666 Thousand Feet
Production Hrs. Annual 4,000
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $344,878 3,803,048 kWh $0.09
Natural Gas $340,491 51,231 MMBtu $6.65
TOTAL ENERGY COSTS $685,369
RECOMMENDED SAVINGS* $230,611 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,214
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Consumption Electricity Usage Natural Gas Water Consumption
$ kWh $ MMBtu $ Tgal
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$109,286
Cost:
$73,056
- - $109,286 - - - -
-
kWh
$109,286
-
MMBtu
-
-
Tgal
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$55,888
Cost:
$14,720
- - $55,888 8,404 - - -
-
kWh
$55,888
8,404
MMBtu
-
-
Tgal
03: 2.1224 REPLACE BOILER Savings:
$26,214
Cost:
-
- - $26,214 3,942 - - -
-
kWh
$26,214
3,942
MMBtu
-
-
Tgal
04: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$20,398
Cost:
$47,520
- - $20,398 3,067 - - -
-
kWh
$20,398
3,067
MMBtu
-
-
Tgal
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$9,189
Cost:
$7,537
- - $9,189 1,382 - - -
-
kWh
$9,189
1,382
MMBtu
-
-
Tgal
06: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$4,616
Cost:
$385
$(-266) (-2,931) - - $4,882 - $(-266)
(-2,931)
kWh
-
-
MMBtu
$4,882
-
Tgal
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,120
Cost:
$7,480
$4,120 47,186 - - - - $4,120
47,186
kWh
-
-
MMBtu
-
-
Tgal
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$900
Cost:
$320
- - $900 135 - - -
-
kWh
$900
135
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$230,611
Cost:
$151,018
$3,854 44,255 $221,875 16,930 $4,882 - $3,854
44,255
kWh
$221,875
16,930
MMBtu
$4,882
-
Tgal
TOTAL IMPLEMENTED Savings:
$26,214
Cost:
-
- - $26,214 3,942 - - -
-
kWh
$26,214
3,942
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ Tgal
Electricity Usage Natural Gas Water Consumption Electricity Usage Natural Gas Water Consumption