Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1993 |
Principal Product | napkins,towels and wrapp |
NAICS | n/a |
SIC | 2676 - Sanitary Paper Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 42 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 22,659 Tons |
Production Hrs. Annual | 7,344 |
Location (State) | VT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $716,176 | 9,919,109 | kWh | $0.07 |
Fuel Oil #6 | $252,640 | 125,238 | MMBtu | $2.02 |
TOTAL ENERGY COSTS | $968,816 | |||
RECOMMENDED SAVINGS* | $373,896 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $24,600 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #2 | Fuel Oil #6 | Electricity Usage | Fuel Oil #2 | Fuel Oil #6 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $334,726 Cost: $400,000 |
$716,176 | 9,919,109 | $(-432,598) | (-86,520) | $51,148 | 25,321 |
$716,176 9,919,109 kWh |
$(-432,598) (-86,520) MMBtu |
$51,148 25,321 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $16,949 Cost: $29,400 |
$16,949 | 234,760 | - | - | - | - |
$16,949 234,760 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $14,570 Cost: $45,308 |
$(-6,517) | (-90,270) | - | - | $21,087 | 10,439 |
$(-6,517) (-90,270) kWh |
- - MMBtu |
$21,087 10,439 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $5,205 Cost: - |
$5,205 | 72,098 | - | - | - | - |
$5,205 72,098 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $1,406 Cost: $1,408 |
- | - | - | - | $1,406 | 696 |
- - kWh |
- - MMBtu |
$1,406 696 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES |
Savings: $1,040 Cost: $4,230 |
- | - | - | - | $1,040 | 515 |
- - kWh |
- - MMBtu |
$1,040 515 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $373,896 Cost: $480,346 |
$731,813 | 10,135,697 | $(-432,598) | (-86,520) | $74,681 | 36,971 | $731,813 10,135,697 kWh |
$(-432,598) (-86,520) MMBtu |
$74,681 36,971 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $24,600 Cost: $35,038 |
$22,154 | 306,858 | - | - | $2,446 | 1,211 | $22,154 306,858 kWh |
- - MMBtu |
$2,446 1,211 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #2 | Fuel Oil #6 | Electricity Usage | Fuel Oil #2 | Fuel Oil #6 |