IAC logo
IAC Assessment: MA0293
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0293
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1994
Principal Product Turbine Blade and Vane Maint/Coating
NAICS n/a
SIC 3479 - Metal Coating And Allied Services
Sales $10,000,000-$50,000,000
# of Employees 270
Plant Area (Sq.Ft.) 132,500
Annual Production 0 Units
Production Hrs. Annual 4,992
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $490,274 6,419,988 kWh $0.08
Natural Gas $287,830 41,442 MMBtu $6.95
TOTAL ENERGY COSTS $778,104
RECOMMENDED SAVINGS* $130,536 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,615
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$100,844
Cost:
$54,704
- - - - $100,844 - -
-
kWh
-
-
MMBtu
$100,844
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$21,561
Cost:
$34,000
$33,973 444,900 $(-12,412) (-1,786) - - $33,973
444,900
kWh
$(-12,412)
(-1,786)
MMBtu
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,149
Cost:
$644
$2,149 28,136 - - - - $2,149
28,136
kWh
-
-
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$491
Cost:
$100
$491 8,792 - - - - $491
8,792
kWh
-
-
MMBtu
-
-
$
05: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,467
Cost:
$982
- - $1,467 211 - - -
-
kWh
$1,467
211
MMBtu
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,209
Cost:
$334
$1,209 15,826 - - - - $1,209
15,826
kWh
-
-
MMBtu
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,007
Cost:
$218
$1,007 13,189 - - - - $1,007
13,189
kWh
-
-
MMBtu
-
-
$
08: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$769
Cost:
-
- - $769 111 - - -
-
kWh
$769
111
MMBtu
-
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$739
Cost:
-
$739 9,672 - - - - $739
9,672
kWh
-
-
MMBtu
-
-
$
10: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$300
Cost:
$961
$300 3,517 - - - - $300
3,517
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$130,536
Cost:
$91,943
$39,868 524,032 $(-10,176) (-1,464) $100,844 - $39,868
524,032
kWh
$(-10,176)
(-1,464)
MMBtu
$100,844
-
$
TOTAL IMPLEMENTED Savings:
$5,615
Cost:
$1,726
$3,379 46,600 $2,236 322 - - $3,379
46,600
kWh
$2,236
322
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes