IAC Assessment: MA0299
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0299
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1994
Principal Product coorrugated products
NAICS n/a
SIC 2621 - Paper Mills
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 171,375
Annual Production 0 Units
Production Hrs. Annual 6,240
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $534,115 6,821,512 kWh $0.08
Natural Gas $108,939 33,456 MMBtu $3.26
Fuel Oil #4 $82,833 23,401 MMBtu $3.54
TOTAL ENERGY COSTS $725,887
RECOMMENDED SAVINGS* $73,800 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$35,014
Cost:
$102,795
$64,794 827,374 $(-29,780) (-8,535) $64,794
827,374
kWh
$(-29,780)
(-8,535)
MMBtu
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$4,797
Cost:
$4,000
$4,797 61,254 - - $4,797
61,254
kWh
-
-
MMBtu
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$9,593
Cost:
$1,526
$9,593 122,509 - - $9,593
122,509
kWh
-
-
MMBtu
04: 2.7122 DISCONNECT BALLASTS Savings:
$8,033
Cost:
$411
$8,033 102,579 - - $8,033
102,579
kWh
-
-
MMBtu
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,707
Cost:
-
$1,707 21,688 - - $1,707
21,688
kWh
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$597
Cost:
$525
$597 7,620 - - $597
7,620
kWh
-
-
MMBtu
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$6,724
Cost:
-
$6,724 85,580 - - $6,724
85,580
kWh
-
-
MMBtu
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,792
Cost:
$1,267
- - $4,792 1,470 -
-
kWh
$4,792
1,470
MMBtu
09: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,660
Cost:
$5,030
- - $1,660 469 -
-
kWh
$1,660
469
MMBtu
10: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$470
Cost:
$1,396
- - $470 260 -
-
kWh
$470
260
MMBtu
11: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$413
Cost:
$1,650
$413 5,275 - - $413
5,275
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$73,800
Cost:
$118,600
$96,658 1,233,879 $(-22,858) (-6,336) $96,658
1,233,879
kWh
$(-22,858)
(-6,336)
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas