Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1994 |
Principal Product | Flight Suits |
NAICS | n/a |
SIC | 3842 - Surgical Appliances And Supplies |
Sales | $10,000,000-$50,000,000 |
# of Employees | 290 |
Plant Area (Sq.Ft.) | 243,088 |
Annual Production | 0 Units |
Production Hrs. Annual | 2,125 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $151,080 | 1,541,325 | kWh | $0.10 |
Natural Gas | $3,699 | 594 | MMBtu | $6.23 |
Fuel Oil #6 | $41,184 | 12,790 | MMBtu | $3.22 |
TOTAL ENERGY COSTS | $195,963 | |||
RECOMMENDED SAVINGS* | $30,117 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $28,459 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #6 | Electricity Usage | Fuel Oil #6 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $8,482 Cost: - |
$8,482 | 86,460 | - | - |
$8,482 86,460 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $686 Cost: $210 |
$686 | 7,034 | - | - |
$686 7,034 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $8,256 Cost: $16,853 |
$8,256 | 84,115 | - | - |
$8,256 84,115 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $4,090 Cost: $3,058 |
$4,090 | 41,618 | - | - |
$4,090 41,618 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7122 DISCONNECT BALLASTS |
Savings: $1,042 Cost: $67 |
$1,042 | 10,551 | - | - |
$1,042 10,551 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $5,397 Cost: $2,232 |
- | - | $5,397 | 2,604 |
- - kWh |
$5,397 2,604 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $1,658 Cost: - |
- | - | $1,658 | 515 |
- - kWh |
$1,658 515 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $506 Cost: - |
$506 | 5,275 | - | - |
$506 5,275 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $30,117 Cost: $22,420 |
$23,062 | 235,053 | $7,055 | 3,119 | $23,062 235,053 kWh |
$7,055 3,119 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $28,459 Cost: $22,420 |
$23,062 | 235,053 | $5,397 | 2,604 | $23,062 235,053 kWh |
$5,397 2,604 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #6 | Electricity Usage | Fuel Oil #6 |