IAC logo
IAC Assessment: MA0301
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0301
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1994
Principal Product paper
NAICS n/a
SIC 2672 - Paper Coated And Laminated, Nec
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 174,000
Annual Production 14,500 Tons
Production Hrs. Annual 5,760
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,778,197 20,215,416 kWh $0.09
Fuel Oil #6 $832,233 324,358 MMBtu $2.57
TOTAL ENERGY COSTS $2,610,430
RECOMMENDED SAVINGS* $522,079 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $498,484
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #6 Electricity Usage Fuel Oil #6
$ kWh $ MMBtu
01: 2.5123 REDUCE FLUID FLOW RATES Savings:
$480,000
Cost:
$657,000
- - $480,000 186,914 -
-
kWh
$480,000
186,914
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$16,698
Cost:
$27,600
$16,698 189,918 - - $16,698
189,918
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,256
Cost:
$4,383
$14,256 162,075 - - $14,256
162,075
kWh
-
-
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,228
Cost:
-
$4,228 48,066 - - $4,228
48,066
kWh
-
-
MMBtu
05: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS Savings:
$3,790
Cost:
$1,236
$3,790 43,083 - - $3,790
43,083
kWh
-
-
MMBtu
06: 2.2692 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER Savings:
$1,830
Cost:
$5,906
$1,830 20,809 - - $1,830
20,809
kWh
-
-
MMBtu
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,277
Cost:
$2,540
$1,277 14,654 - - $1,277
14,654
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$522,079
Cost:
$698,665
$42,079 478,605 $480,000 186,914 $42,079
478,605
kWh
$480,000
186,914
MMBtu
TOTAL IMPLEMENTED Savings:
$498,484
Cost:
$661,383
$18,484 210,141 $480,000 186,914 $18,484
210,141
kWh
$480,000
186,914
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Fuel Oil #6 Electricity Usage Fuel Oil #6