Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1994 |
Principal Product | sheet metal cabinets |
NAICS | n/a |
SIC | 3444 - Sheet Metalwork |
Sales | $5,000,000-$10,000,000 |
# of Employees | 79 |
Plant Area (Sq.Ft.) | 112,200 |
Annual Production | 5,000,000 Pounds |
Production Hrs. Annual | 4,250 |
Location (State) | CT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $115,860 | 945,193 | kWh | $0.12 |
Natural Gas | $84,122 | 11,499 | MMBtu | $7.32 |
Fuel Oil #2 | $5,344 | 1,220 | MMBtu | $4.38 |
TOTAL ENERGY COSTS | $205,326 | |||
RECOMMENDED SAVINGS* | $62,591 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $53,388 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (haz) | Administrative Changes | Electricity Usage | Natural Gas | Solid Waste (haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER |
Savings: $30,270 Cost: $59,522 |
- | - | - | - | - | - | $30,270 | - |
- - kWh |
- - MMBtu |
- - lb |
$30,270 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $5,790 Cost: $23,672 |
- | - | $5,790 | 791 | - | - | - | - |
- - kWh |
$5,790 791 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,605 Cost: - |
$5,605 | 47,186 | - | - | - | - | - | - |
$5,605 47,186 kWh |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $5,208 Cost: $6,560 |
- | - | $5,208 | 711 | - | - | - | - |
- - kWh |
$5,208 711 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $3,090 Cost: - |
$3,090 | 25,205 | - | - | - | - | - | - |
$3,090 25,205 kWh |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $323 Cost: $225 |
$323 | 2,638 | - | - | - | - | - | - |
$323 2,638 kWh |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $9,505 Cost: $2,697 |
- | - | - | - | $9,505 | - | - | - |
- - kWh |
- - MMBtu |
$9,505 - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $2,800 Cost: - |
- | - | - | - | $2,800 | - | - | - |
- - kWh |
- - MMBtu |
$2,800 - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $62,591 Cost: $92,676 |
$9,018 | 75,029 | $10,998 | 1,502 | $12,305 | - | $30,270 | - | $9,018 75,029 kWh |
$10,998 1,502 MMBtu |
$12,305 - lb |
$30,270 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $53,388 Cost: $68,779 |
$5,605 | 47,186 | $5,208 | 711 | $12,305 | - | $30,270 | - | $5,605 47,186 kWh |
$5,208 711 MMBtu |
$12,305 - lb |
$30,270 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (haz) | Administrative Changes | Electricity Usage | Natural Gas | Solid Waste (haz) | Administrative Changes |