IAC logo
IAC Assessment: MA0310
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0310
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1994
Principal Product sheet metal cabinets
NAICS n/a
SIC 3444 - Sheet Metalwork
Sales $5,000,000-$10,000,000
# of Employees 79
Plant Area (Sq.Ft.) 112,200
Annual Production 5,000,000 Pounds
Production Hrs. Annual 4,250
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $115,860 945,193 kWh $0.12
Natural Gas $84,122 11,499 MMBtu $7.32
Fuel Oil #2 $5,344 1,220 MMBtu $4.38
TOTAL ENERGY COSTS $205,326
RECOMMENDED SAVINGS* $62,591 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $53,388
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (haz) Administrative Changes Electricity Usage Natural Gas Solid Waste (haz) Administrative Changes
$ kWh $ MMBtu $ lb $ $
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$30,270
Cost:
$59,522
- - - - - - $30,270 - -
-
kWh
-
-
MMBtu
-
-
lb
$30,270
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,790
Cost:
$23,672
- - $5,790 791 - - - - -
-
kWh
$5,790
791
MMBtu
-
-
lb
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,605
Cost:
-
$5,605 47,186 - - - - - - $5,605
47,186
kWh
-
-
MMBtu
-
-
lb
-
-
$
04: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$5,208
Cost:
$6,560
- - $5,208 711 - - - - -
-
kWh
$5,208
711
MMBtu
-
-
lb
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,090
Cost:
-
$3,090 25,205 - - - - - - $3,090
25,205
kWh
-
-
MMBtu
-
-
lb
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$323
Cost:
$225
$323 2,638 - - - - - - $323
2,638
kWh
-
-
MMBtu
-
-
lb
-
-
$
07: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$9,505
Cost:
$2,697
- - - - $9,505 - - - -
-
kWh
-
-
MMBtu
$9,505
-
lb
-
-
$
08: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$2,800
Cost:
-
- - - - $2,800 - - - -
-
kWh
-
-
MMBtu
$2,800
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$62,591
Cost:
$92,676
$9,018 75,029 $10,998 1,502 $12,305 - $30,270 - $9,018
75,029
kWh
$10,998
1,502
MMBtu
$12,305
-
lb
$30,270
-
$
TOTAL IMPLEMENTED Savings:
$53,388
Cost:
$68,779
$5,605 47,186 $5,208 711 $12,305 - $30,270 - $5,605
47,186
kWh
$5,208
711
MMBtu
$12,305
-
lb
$30,270
-
$
Savings
Cost
$ kWh $ MMBtu $ lb $ $
Electricity Usage Natural Gas Solid Waste (haz) Administrative Changes Electricity Usage Natural Gas Solid Waste (haz) Administrative Changes