Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1994 |
Principal Product | laser systems |
NAICS | n/a |
SIC | 3661 - Telephone And Telegraph Apparatus |
Sales | $10,000,000-$50,000,000 |
# of Employees | 53 |
Plant Area (Sq.Ft.) | 60,000 |
Annual Production | 36 Pieces |
Production Hrs. Annual | 2,600 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $129,399 | 1,570,047 | kWh | $0.08 |
LPG | $2,743 | 284 | MMBtu | $9.66 |
TOTAL ENERGY COSTS | $132,142 | |||
RECOMMENDED SAVINGS* | $31,609 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,319 |
#|Description |
Savings Cost |
Status | Electricity Usage | LPG | Solid Waste (non-haz) | Electricity Usage | LPG | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $8,673 Cost: $4,305 |
$8,673 | 105,217 | - | - | - | - |
$8,673 105,217 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT |
Savings: $7,659 Cost: $3,520 |
$7,659 | 92,907 | - | - | - | - |
$7,659 92,907 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $3,319 Cost: $521 |
$3,319 | 63,599 | - | - | - | - |
$3,319 63,599 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $2,338 Cost: $4,349 |
$2,338 | - | - | - | - | - |
$2,338 - kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $1,100 Cost: $1,410 |
- | - | $1,100 | 114 | - | - |
- - kWh |
$1,100 114 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $6,000 Cost: $500 |
- | - | - | - | $6,000 | - |
- - kWh |
- - MMBtu |
$6,000 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $2,520 Cost: $383 |
- | - | - | - | $2,520 | - |
- - kWh |
- - MMBtu |
$2,520 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $31,609 Cost: $14,988 |
$21,989 | 261,723 | $1,100 | 114 | $8,520 | - | $21,989 261,723 kWh |
$1,100 114 MMBtu |
$8,520 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,319 Cost: $521 |
$3,319 | 63,599 | - | - | - | - | $3,319 63,599 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | LPG | Solid Waste (non-haz) | Electricity Usage | LPG | Solid Waste (non-haz) |