IAC Assessment: MA0335
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1995
Principal Product Specialty Elastomerics
NAICS n/a
SIC 3069 - Fabricated Rubber Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 82
Plant Area (Sq.Ft.) 41,254
Annual Production 14,000 Pounds
Production Hrs. Annual 4,420
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $87,161 1,228,605 kWh $0.07
Natural Gas $6,899 717 MMBtu $9.62
Fuel Oil #1 $10,693 2,472 MMBtu $4.33
TOTAL ENERGY COSTS $104,753
RECOMMENDED SAVINGS* $7,025 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,177
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #1 Administrative Changes Electricity Usage Fuel Oil #1 Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,545
Cost:
$5,433
$1,545 21,102 - - - - $1,545
21,102
kWh
-
-
MMBtu
-
-
$
02: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$1,479
Cost:
$3,771
$1,479 20,223 - - - - $1,479
20,223
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,352
Cost:
$1,790
$1,352 18,464 - - - - $1,352
18,464
kWh
-
-
MMBtu
-
-
$
04: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING Savings:
$662
Cost:
$400
- - $662 120 - - -
-
kWh
$662
120
MMBtu
-
-
$
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$550
Cost:
$1,199
$832 11,723 $(-282) (-51) - - $832
11,723
kWh
$(-282)
(-51)
MMBtu
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$449
Cost:
$898
$449 8,499 - - - - $449
8,499
kWh
-
-
MMBtu
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$370
Cost:
-
$370 7,034 - - - - $370
7,034
kWh
-
-
MMBtu
-
-
$
08: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$318
Cost:
-
$318 4,396 - - - - $318
4,396
kWh
-
-
MMBtu
-
-
$
09: 2.8112 COMBINE UTILITY METERS Savings:
$300
Cost:
-
- - - - $300 - -
-
kWh
-
-
MMBtu
$300
-
$
TOTAL RECOMMENDED Savings:
$7,025
Cost:
$13,491
$6,345 91,441 $380 69 $300 - $6,345
91,441
kWh
$380
69
MMBtu
$300
-
$
TOTAL IMPLEMENTED Savings:
$4,177
Cost:
$7,623
$3,215 43,962 $662 120 $300 - $3,215
43,962
kWh
$662
120
MMBtu
$300
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Fuel Oil #1 Administrative Changes Electricity Usage Fuel Oil #1 Administrative Changes