Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1995 |
Principal Product | Specialty Elastomerics |
NAICS | n/a |
SIC | 3069 - Fabricated Rubber Products, Nec |
Sales | $1,000,000-$5,000,000 |
# of Employees | 82 |
Plant Area (Sq.Ft.) | 41,254 |
Annual Production | 14,000 Pounds |
Production Hrs. Annual | 4,420 |
Location (State) | CT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $87,161 | 1,228,605 | kWh | $0.07 |
Natural Gas | $6,899 | 717 | MMBtu | $9.62 |
Fuel Oil #1 | $10,693 | 2,472 | MMBtu | $4.33 |
TOTAL ENERGY COSTS | $104,753 | |||
RECOMMENDED SAVINGS* | $7,025 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $4,177 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #1 | Administrative Changes | Electricity Usage | Fuel Oil #1 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,545 Cost: $5,433 |
$1,545 | 21,102 | - | - | - | - |
$1,545 21,102 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $1,479 Cost: $3,771 |
$1,479 | 20,223 | - | - | - | - |
$1,479 20,223 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,352 Cost: $1,790 |
$1,352 | 18,464 | - | - | - | - |
$1,352 18,464 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING |
Savings: $662 Cost: $400 |
- | - | $662 | 120 | - | - |
- - kWh |
$662 120 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $550 Cost: $1,199 |
$832 | 11,723 | $(-282) | (-51) | - | - |
$832 11,723 kWh |
$(-282) (-51) MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $449 Cost: $898 |
$449 | 8,499 | - | - | - | - |
$449 8,499 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $370 Cost: - |
$370 | 7,034 | - | - | - | - |
$370 7,034 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $318 Cost: - |
$318 | 4,396 | - | - | - | - |
$318 4,396 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.8112 COMBINE UTILITY METERS |
Savings: $300 Cost: - |
- | - | - | - | $300 | - |
- - kWh |
- - MMBtu |
$300 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $7,025 Cost: $13,491 |
$6,345 | 91,441 | $380 | 69 | $300 | - | $6,345 91,441 kWh |
$380 69 MMBtu |
$300 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $4,177 Cost: $7,623 |
$3,215 | 43,962 | $662 | 120 | $300 | - | $3,215 43,962 kWh |
$662 120 MMBtu |
$300 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #1 | Administrative Changes | Electricity Usage | Fuel Oil #1 | Administrative Changes |