Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1995 |
Principal Product | metal plating |
NAICS | n/a |
SIC | 3471 - Plating And Polishing |
Sales | $1,000,000-$5,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 23,000 |
Annual Production | 0 Units |
Production Hrs. Annual | 4,862 |
Location (State) | CT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $132,190 | 1,264,654 | kWh | $0.10 |
Natural Gas | $80,623 | 13,090 | MMBtu | $6.16 |
TOTAL ENERGY COSTS | $212,813 | |||
RECOMMENDED SAVINGS* | $89,065 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $5,808 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (haz) | Administrative Changes | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL |
Savings: $4,128 Cost: $1,860 |
- | - | - | - | - | - | - | - | $4,128 | - |
- - kWh |
- - MMBtu |
- - Tgal |
- - lb |
$4,128 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION |
Savings: $1,027 Cost: $3,770 |
$1,027 | 11,723 | - | - | - | - | - | - | - | - |
$1,027 11,723 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $653 Cost: - |
$653 | 7,620 | - | - | - | - | - | - | - | - |
$653 7,620 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $504 Cost: $1,010 |
- | - | $504 | 105 | - | - | - | - | - | - |
- - kWh |
$504 105 MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.4112 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER |
Savings: $57,939 Cost: $118,450 |
- | - | - | - | - | - | $57,939 | 6,336 | - | - |
- - kWh |
- - MMBtu |
- - Tgal |
$57,939 6,336 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.4112 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER |
Savings: $23,990 Cost: $500 |
- | - | - | - | $23,990 | 51,000,000 | - | - | - | - |
- - kWh |
- - MMBtu |
$23,990 51,000,000 Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.1244 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS |
Savings: $824 Cost: $3,000 |
- | - | - | - | - | - | $824 | 4,290 | - | - |
- - kWh |
- - MMBtu |
- - Tgal |
$824 4,290 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $89,065 Cost: $128,590 |
$1,680 | 19,343 | $504 | 105 | $23,990 | 51,000,000 | $58,763 | 10,626 | $4,128 | - | $1,680 19,343 kWh |
$504 105 MMBtu |
$23,990 51,000,000 Tgal |
$58,763 10,626 lb |
$4,128 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $5,808 Cost: $5,630 |
$1,680 | 19,343 | - | - | - | - | - | - | $4,128 | - | $1,680 19,343 kWh |
- - MMBtu |
- - Tgal |
- - lb |
$4,128 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Disposal | Solid Waste (haz) | Administrative Changes | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (haz) | Administrative Changes |