IAC logo
IAC Assessment: MA0345
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0345
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1995
Principal Product Sand Castings
NAICS n/a
SIC 3429 - Hardware, Nec
Sales $5,000,000-$10,000,000
# of Employees 116
Plant Area (Sq.Ft.) 38,000
Annual Production 451,031 Pounds
Production Hrs. Annual 2,125
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $286,735 2,219,226 kWh $0.13
Natural Gas $31,573 5,221 MMBtu $6.05
TOTAL ENERGY COSTS $357,018
RECOMMENDED SAVINGS* $25,840 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,220
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Solid Waste (haz) Electricity Usage Natural Gas Water Disposal Solid Waste (haz)
$ kWh $ MMBtu $ Tgal $ lb
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$7,752
Cost:
$485
- - $7,752 1,200 - - - - -
-
kWh
$7,752
1,200
MMBtu
-
-
Tgal
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,830
Cost:
$39,252
$6,830 53,048 - - - - - - $6,830
53,048
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,255
Cost:
$4,500
$2,255 12,603 - - - - - - $2,255
12,603
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,702
Cost:
$1,200
$1,702 21,102 - - - - - - $1,702
21,102
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
05: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$941
Cost:
$300
$941 10,551 - - - - - - $941
10,551
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$549
Cost:
-
$549 6,155 - - - - - - $549
6,155
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
07: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$496
Cost:
$165
$496 5,569 - - - - - - $496
5,569
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
08: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$404
Cost:
$500
$404 4,396 - - - - - - $404
4,396
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
09: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$3,961
Cost:
$20,000
- - - - $3,961 409,900 - - -
-
kWh
-
-
MMBtu
$3,961
409,900
Tgal
-
-
lb
10: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$950
Cost:
$2,700
- - - - - - $950 2 -
-
kWh
-
-
MMBtu
-
-
Tgal
$950
2
lb
TOTAL RECOMMENDED Savings:
$25,840
Cost:
$69,102
$13,177 113,424 $7,752 1,200 $3,961 409,900 $950 2 $13,177
113,424
kWh
$7,752
1,200
MMBtu
$3,961
409,900
Tgal
$950
2
lb
TOTAL IMPLEMENTED Savings:
$19,220
Cost:
$44,102
$10,518 96,425 $7,752 1,200 - - $950 2 $10,518
96,425
kWh
$7,752
1,200
MMBtu
-
-
Tgal
$950
2
lb
Savings
Cost
$ kWh $ MMBtu $ Tgal $ lb
Electricity Usage Natural Gas Water Disposal Solid Waste (haz) Electricity Usage Natural Gas Water Disposal Solid Waste (haz)