Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1995 |
Principal Product | Sand Castings |
NAICS | n/a |
SIC | 3429 - Hardware, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 116 |
Plant Area (Sq.Ft.) | 38,000 |
Annual Production | 451,031 Pounds |
Production Hrs. Annual | 2,125 |
Location (State) | NH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $286,735 | 2,219,226 | kWh | $0.13 |
Natural Gas | $31,573 | 5,221 | MMBtu | $6.05 |
TOTAL ENERGY COSTS | $357,018 | |||
RECOMMENDED SAVINGS* | $25,840 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $19,220 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (haz) | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $7,752 Cost: $485 |
- | - | $7,752 | 1,200 | - | - | - | - |
- - kWh |
$7,752 1,200 MMBtu |
- - Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,830 Cost: $39,252 |
$6,830 | 53,048 | - | - | - | - | - | - |
$6,830 53,048 kWh |
- - MMBtu |
- - Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $2,255 Cost: $4,500 |
$2,255 | 12,603 | - | - | - | - | - | - |
$2,255 12,603 kWh |
- - MMBtu |
- - Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,702 Cost: $1,200 |
$1,702 | 21,102 | - | - | - | - | - | - |
$1,702 21,102 kWh |
- - MMBtu |
- - Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $941 Cost: $300 |
$941 | 10,551 | - | - | - | - | - | - |
$941 10,551 kWh |
- - MMBtu |
- - Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $549 Cost: - |
$549 | 6,155 | - | - | - | - | - | - |
$549 6,155 kWh |
- - MMBtu |
- - Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $496 Cost: $165 |
$496 | 5,569 | - | - | - | - | - | - |
$496 5,569 kWh |
- - MMBtu |
- - Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $404 Cost: $500 |
$404 | 4,396 | - | - | - | - | - | - |
$404 4,396 kWh |
- - MMBtu |
- - Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.4113 TREAT AND REUSE RINSE WATERS |
Savings: $3,961 Cost: $20,000 |
- | - | - | - | $3,961 | 409,900 | - | - |
- - kWh |
- - MMBtu |
$3,961 409,900 Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $950 Cost: $2,700 |
- | - | - | - | - | - | $950 | 2 |
- - kWh |
- - MMBtu |
- - Tgal |
$950 2 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $25,840 Cost: $69,102 |
$13,177 | 113,424 | $7,752 | 1,200 | $3,961 | 409,900 | $950 | 2 | $13,177 113,424 kWh |
$7,752 1,200 MMBtu |
$3,961 409,900 Tgal |
$950 2 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $19,220 Cost: $44,102 |
$10,518 | 96,425 | $7,752 | 1,200 | - | - | $950 | 2 | $10,518 96,425 kWh |
$7,752 1,200 MMBtu |
- - Tgal |
$950 2 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Disposal | Solid Waste (haz) | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (haz) |