Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1995 |
Principal Product | Heat Treatment of Steel Parts |
NAICS | n/a |
SIC | 3398 - Metal Heat Treating |
Sales | $10,000,000-$50,000,000 |
# of Employees | 31 |
Plant Area (Sq.Ft.) | 41,500 |
Annual Production | 9,968,000 Pounds |
Production Hrs. Annual | 7,500 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $246,444 | 3,270,516 | kWh | $0.08 |
Natural Gas | $218,487 | 41,930 | MMBtu | $5.21 |
TOTAL ENERGY COSTS | $495,843 | |||
RECOMMENDED SAVINGS* | $47,097 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $32,066 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Other Liquid (haz) | Solid Waste (haz) | Electricity Usage | Natural Gas | Other Liquid (haz) | Solid Waste (haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | gal | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $10,329 Cost: $20,441 |
$13,551 | 145,955 | $(-3,222) | (-622) | - | - | - | - |
$13,551 145,955 kWh |
$(-3,222) (-622) MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $3,019 Cost: $1,750 |
- | - | $3,019 | 582 | - | - | - | - |
- - kWh |
$3,019 582 MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,154 Cost: $8,175 |
$2,154 | 28,429 | - | - | - | - | - | - |
$2,154 28,429 kWh |
- - MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $364 Cost: $80 |
$364 | 5,275 | - | - | - | - | - | - |
$364 5,275 kWh |
- - MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $319 Cost: $900 |
$319 | 4,689 | - | - | - | - | - | - |
$319 4,689 kWh |
- - MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5111 FILTER AND REUSE HYDRAULIC OIL |
Savings: $29,912 Cost: $51,750 |
- | - | - | - | $29,912 | 5,760 | - | - |
- - kWh |
- - MMBtu |
$29,912 5,760 gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.6194 SHIP HYDRAULIC OIL TO SECONDARY FUEL PROGRAM |
Savings: $1,000 Cost: - |
- | - | - | - | - | - | $1,000 | - |
- - kWh |
- - MMBtu |
- - gal |
$1,000 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $47,097 Cost: $83,096 |
$16,388 | 184,348 | $(-203) | (-40) | $29,912 | 5,760 | $1,000 | - | $16,388 184,348 kWh |
$(-203) (-40) MMBtu |
$29,912 5,760 gal |
$1,000 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $32,066 Cost: $59,925 |
$2,154 | 28,429 | - | - | $29,912 | 5,760 | - | - | $2,154 28,429 kWh |
- - MMBtu |
$29,912 5,760 gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | gal | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Other Liquid (haz) | Solid Waste (haz) | Electricity Usage | Natural Gas | Other Liquid (haz) | Solid Waste (haz) |