Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1996
Principal Product aerospace metal stampings
NAICS n/a
SIC 3469 - Metal Stampings, Nec
Sales $10,000,000-$50,000,000
# of Employees 230
Plant Area (Sq.Ft.) 100,000
Annual Production 300,000 Pieces
Production Hrs. Annual 6,000
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $168,766 3,134,232 kWh $0.05
Electricity Demand $89,269 10,342 kW-months/year $8.63
Electricity Fees $4,765 - $ -
LPG $1,921 165 MMBtu $11.64
Fuel Oil #4 $73,031 16,777 MMBtu $4.35
TOTAL ENERGY COSTS $344,692
RECOMMENDED SAVINGS* $29,139 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,470
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #4 Other Liquid (haz) Ancillary Material Cost Electricity Usage Electricity Demand Fuel Oil #4 Other Liquid (haz) Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$19,522
Cost:
$57,000
$14,912 250,586 $4,610 502 - - - - - - $14,912
250,586
kWh
$4,610
502
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
02: 3.8143 RECYCLE CLEANING SOLVENT AND REUSE Savings:
$5,470
Cost:
-
- - - - - - $2,500 1,100 $2,970 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,500
1,100
gal
$2,970
-
$
03: 2.2694 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE Savings:
$2,724
Cost:
$5,000
$2,724 45,721 - - - - - - - - $2,724
45,721
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,018
Cost:
$1,720
- - - - $1,018 234 - - - - -
-
kWh
-
-
kW-months/year
$1,018
234
MMBtu
-
-
gal
-
-
$
05: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$405
Cost:
-
$405 8,499 - - - - - - - - $405
8,499
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
TOTAL RECOMMENDED Savings:
$29,139
Cost:
$63,720
$18,041 304,806 $4,610 502 $1,018 234 $2,500 1,100 $2,970 - $18,041
304,806
kWh
$4,610
502
kW-months/year
$1,018
234
MMBtu
$2,500
1,100
gal
$2,970
-
$
TOTAL IMPLEMENTED Savings:
$5,470
Cost:
-
- - - - - - $2,500 1,100 $2,970 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,500
1,100
gal
$2,970
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $