IAC Assessment: MA0355
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0355
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1996
Principal Product military vehicle sensory equipment
NAICS n/a
SIC 3679 - Electronic Components, Nec
Sales $10,000,000-$50,000,000
# of Employees 175
Plant Area (Sq.Ft.) 70,000
Annual Production 22,000 Pieces
Production Hrs. Annual 2,125
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $90,291 1,028,722 kWh $0.09
Electricity Demand $21,568 2,891 kW-months/year $7.46
Fuel Oil #2 $6,000 1,225 MMBtu $4.90
TOTAL ENERGY COSTS $131,699
RECOMMENDED SAVINGS* $28,928 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,368
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Other Liquid (non-haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Fuel Oil #2 Other Liquid (non-haz) Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ gal $ lb
01: 2.6232 INSTALL SET-BACK TIMERS Savings:
$4,082
Cost:
-
- - - - $4,082 756 - - - - -
-
kWh
-
-
kW-months/year
$4,082
756
MMBtu
-
-
gal
-
-
lb
02: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$4,520
Cost:
$2,700
- - - - - - $4,520 440 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,520
440
gal
-
-
lb
03: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$3,840
Cost:
$2,200
- - - - - - - - $3,840 19,200 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$3,840
19,200
lb
04: 2.7264 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION Savings:
$5,576
Cost:
$24,000
$4,863 55,686 $713 101 - - - - - - $4,863
55,686
kWh
$713
101
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,888
Cost:
$52,000
$6,710 76,495 $3,178 432 - - - - - - $6,710
76,495
kWh
$3,178
432
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
06: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$960
Cost:
$79
- - - - - - - - $960 4,800 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$960
4,800
lb
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$62
Cost:
$102
$62 586 - - - - - - - - $62
586
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
TOTAL RECOMMENDED Savings:
$28,928
Cost:
$81,081
$11,635 132,767 $3,891 533 $4,082 756 $4,520 440 $4,800 24,000 $11,635
132,767
kWh
$3,891
533
kW-months/year
$4,082
756
MMBtu
$4,520
440
gal
$4,800
24,000
lb
TOTAL IMPLEMENTED Savings:
$15,368
Cost:
$54,779
$6,710 76,495 $3,178 432 - - $4,520 440 $960 4,800 $6,710
76,495
kWh
$3,178
432
kW-months/year
-
-
MMBtu
$4,520
440
gal
$960
4,800
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb
Electricity Usage Electricity Demand Fuel Oil #2 Other Liquid (non-haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Fuel Oil #2 Other Liquid (non-haz) Solid Waste (non-haz)