Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 1996 |
Principal Product | military vehicle sensory equipment |
NAICS | n/a |
SIC | 3679 - Electronic Components, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 175 |
Plant Area (Sq.Ft.) | 70,000 |
Annual Production | 22,000 Pieces |
Production Hrs. Annual | 2,125 |
Location (State) | NH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $90,291 | 1,028,722 | kWh | $0.09 |
Electricity Demand | $21,568 | 2,891 | kW-months/year | $7.46 |
Fuel Oil #2 | $6,000 | 1,225 | MMBtu | $4.90 |
TOTAL ENERGY COSTS | $131,699 | |||
RECOMMENDED SAVINGS* | $28,928 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $15,368 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #2 | Other Liquid (non-haz) | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Fuel Oil #2 | Other Liquid (non-haz) | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $4,082 Cost: - |
- | - | - | - | $4,082 | 756 | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,082 756 MMBtu |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $4,520 Cost: $2,700 |
- | - | - | - | - | - | $4,520 | 440 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$4,520 440 gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $3,840 Cost: $2,200 |
- | - | - | - | - | - | - | - | $3,840 | 19,200 |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$3,840 19,200 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7264 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION |
Savings: $5,576 Cost: $24,000 |
$4,863 | 55,686 | $713 | 101 | - | - | - | - | - | - |
$4,863 55,686 kWh |
$713 101 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $9,888 Cost: $52,000 |
$6,710 | 76,495 | $3,178 | 432 | - | - | - | - | - | - |
$6,710 76,495 kWh |
$3,178 432 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS |
Savings: $960 Cost: $79 |
- | - | - | - | - | - | - | - | $960 | 4,800 |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$960 4,800 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $62 Cost: $102 |
$62 | 586 | - | - | - | - | - | - | - | - |
$62 586 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $28,928 Cost: $81,081 |
$11,635 | 132,767 | $3,891 | 533 | $4,082 | 756 | $4,520 | 440 | $4,800 | 24,000 | $11,635 132,767 kWh |
$3,891 533 kW-months/year |
$4,082 756 MMBtu |
$4,520 440 gal |
$4,800 24,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $15,368 Cost: $54,779 |
$6,710 | 76,495 | $3,178 | 432 | - | - | $4,520 | 440 | $960 | 4,800 | $6,710 76,495 kWh |
$3,178 432 kW-months/year |
- - MMBtu |
$4,520 440 gal |
$960 4,800 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #2 | Other Liquid (non-haz) | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Fuel Oil #2 | Other Liquid (non-haz) | Solid Waste (non-haz) |