Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1996
Principal Product buoys
NAICS n/a
SIC 3299 - Nonmetallic Mineral Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 45
Plant Area (Sq.Ft.) 100,000
Annual Production 12,500,000 Pieces
Production Hrs. Annual 6,000
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $93,132 1,515,533 kWh $0.06
Electricity Demand $52,555 3,488 kW-months/year $15.07
Fuel Oil #4 $223,416 52,200 MMBtu $4.28
TOTAL ENERGY COSTS $369,103
RECOMMENDED SAVINGS* $23,682 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #4 Other Liquid (haz) Electricity Usage Electricity Demand Fuel Oil #4 Other Liquid (haz)
$ kWh $ kW-months/year $ MMBtu $ gal
01: 2.7293 INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS Savings:
$9,520
Cost:
$17,800
- - - - $9,520 2,224 - - -
-
kWh
-
-
kW-months/year
$9,520
2,224
MMBtu
-
-
gal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,359
Cost:
$13,344
$6,226 70,926 $133 12 - - - - $6,226
70,926
kWh
$133
12
kW-months/year
-
-
MMBtu
-
-
gal
03: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$5,436
Cost:
$6,000
- - - - - - $5,436 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,436
-
gal
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$933
Cost:
$1,440
$933 14,947 - - - - - - $933
14,947
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$830
Cost:
-
$830 8,499 - - - - - - $830
8,499
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$604
Cost:
$350
$604 9,672 - - - - - - $604
9,672
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
TOTAL RECOMMENDED Savings:
$23,682
Cost:
$38,934
$8,593 104,044 $133 12 $9,520 2,224 $5,436 - $8,593
104,044
kWh
$133
12
kW-months/year
$9,520
2,224
MMBtu
$5,436
-
gal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal
Electricity Usage Electricity Demand Fuel Oil #4 Other Liquid (haz) Electricity Usage Electricity Demand Fuel Oil #4 Other Liquid (haz)